Traditional Chinese 康城 Hanyu Pinyin Jyutping hong1 sing4 Opened 26 July 2009 | Simplified Chinese 康城 Yale Romanization hong1 sing4 Address Lohas Park, Hong Kong Level 1 | |
![]() | ||
Location 1 LOHAS Park Road, LOHAS Park, Tseung Kwan O
Sai Kung District, Hong Kong Similar Tseung Kwan O Station, Tiu Keng Leng Station, Po Lam Station, Yau Tong Station, Quarry Bay Station |
mtr k train arriving tseung kwan o line lohas park station
LOHAS Park (Chinese: 康城; Jyutping: hong1sing4; Cantonese Yale: hong1sing4) is a rapid transit station on the Tseung Kwan O Line of the MTR system in Hong Kong. It opened on 26 July 2009.
Contents
- mtr k train arriving tseung kwan o line lohas park station
- Mtr tseung kwan o line lohas park station tiu keng leng station
- Location
- Transit oriented development
- History
- Service controversy
- Station layout
- Entrances and exits
- Ground G
- Podium U3
- Transport connections
- Minibus route
- References
Mtr tseung kwan o line lohas park station tiu keng leng station
Location
The station serves a residential project called LOHAS Park (formerly "Dream City") at Area 86. The first tenders for the construction of Phase 1 were completed in January 2005. Next to the Tseung Kwan O Line Depot, it is the easternmost railway station in Hong Kong.
Transit-oriented development
In accordance with both MTR's "Rail + Property" funding scheme and one of the goals of the Tseung Kwan O Line being to connect large housing estates on the eastern side of Victoria Harbour to Hong Kong Island, LOHAS Park is a site for transit-oriented development. LOHAS Park will be the largest MTR property development, a 32.08 ha (79.3 acres) site with 50 towers containing 21,500 apartments and approximately 45,000 m2 (480,000 sq ft) of retail.
History
During the construction stages, the station was temporarily named Tseung Kwan O South, after its location in the southern part of the Tseung Kwan O New Town.
Since the station opened, the Tseung Kwan O Line has been split into two branches at Tseung Kwan O, with the original northern branch towards Po Lam, and the new southern branch towards LOHAS Park. This is the second branch in the MTR system, after Lok Ma Chau Station on the East Rail Line.
Service controversy
To operate the branch, MTR instituted a "3+1" service whereby every fourth train runs to LOHAS Park. After 8 December 2014, MTR instituted a "2+1" service in peak hours. Off peak and Sundays, a shuttle train between LOHAS Park and Tiu Keng Leng would operate. This is one example when the "terminus" of some trains are within intermediate stations.
Although MTR compensated for the slight reduction of service by decreasing headways by ten seconds to 2.5 minutes, residents and passengers have complained that the branched nature of the line has increased delays. MTR claims that its on-time rate is still 99.9%.
Station layout
There are two platform faces on an island platform. Like in other underground MTR stations, platform screen doors have been installed.
Entrances and exits
There are three entrances/exits. One of them leads to the public transport interchange located adjacent to the station, while the remaining two lead to LOHAS Park residential development. Exit B has not been built yet and it is reserved for future use.
Ground (G)
Podium (U3)
Transport connections
Minibus and taxis can be accessed from Exit A.
Minibus route
To Tseung Kwan O: