Supriya Ghosh (Editor)

Kuwait Metropolitan Rapid Transit System Project

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit

The Kuwait Metropolitan Rapid Transit System Project is developing a metro network in Kuwait.

Contents

Routes

Four lines will be built in five phases, to total 160 km with 69 stations.

  • Line 1: 23.7 km, 19 stations, +57.3 km extension
  • Line 2: 21 km, 27 stations, +16.4 km extension
  • Line 3: 24 km, 15 stations
  • Line 4: 22.7 km, 17 stations
  • Construction

    The government Partnerships Technical Bureau was to begin procurement in 2012, using PPP contracts. However, tendering is now scheduled for 2016, with line 1 scheduled to begin operations in 2020.

    References

    Kuwait Metropolitan Rapid Transit System Project Wikipedia