Neha Patil (Editor)

Klang Valley Integrated Transit System

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Klang Valley Integrated Transit System

Native name
  
Sistem Transit Bersepadu Lembah Klang  (Malay)

Locale
  
Transit type
  
Number of lines
  
15 (10 in operation, 3 under construction and 2 under planning)

Began operation
  
14 August 1995; 21 years ago (1995-08-14)

The Klang Valley Integrated Transit System (TRANSIT) consists of two commuter rail lines, five rapid transit lines, one bus rapid transit line and an airport rail link to Kuala Lumpur International Airport, which consists of an express and a transit service.

Contents

History

Initially, different competing companies had operated the various systems and had developed these commuter rail lines separately and at different times. As a result, many of these lines do not integrate well with the others or with the overall system itself, making transferring from system to system inconvenient for the passengers. Moving from one system to another often require a lot of walking, stair-climbing, escalator-use and even crossing busy roads. For example, the KL Monorail's "KL Sentral" station is a 140-metre walk away through a newly built shopping complex named "NU Sentral". The integrated ticket for all rail-based systems, such as TnG cards, would help any passenger transfer seamlessly across all stations in the system.

Integration

Since 28 November 2011, the paid areas of the Kelana Jaya and Ampang LRT lines, as well as the KL Monorail from 1 March 2012, had been integrated physically under a common ticketing system. This enables commuters to transfer between lines at certain interchange stations without buying a new ticket each time, provided that they do not exit the paid area. This is currently possible at Titiwangsa station, Hang Tuah station, Putra Heights LRT station and Masjid Jamek LRT station.

The Touch 'n Go stored value farecard is accepted as mode of payment on the Rapid Bus, LRT and monorail lines, as well as the KTM Komuter, easing the hassle of buying separate tickets for travelling on different networks.

Also, Rapid Rail, the operator of the three LRT lines as well as Rapid Bus (which cover about 70% of the Klang Valley's bus network), has come up with a daily bus ticket which cost as low as RM1, and integrated transit daily pass which can be used on both its rail and bus services that costs RM7.

The Integrated Cashless Payment System (ICPS)

Once implemented, the ICPS solution will provide commuters with a seamless and convenient travel experience. The benefits of the ICPS solution are :

  • Barrier-free travel between different rail lines
  • Multiple options for e-payment, including Common Prepaid Cards, Bankcards/Debit Cards, and mobile applications such as Apple Pay and Android Pay
  • Reduced queuing at stations and less station congestion
  • The promotion of a cashless society
  • Commuters will also save a substantial amount of money on public transport once the ICPS solution has been implemented:

  • No transfer premiums will be charged for integrated journeys
  • Special discounts will be given for customised products, suited to each group of commuters present within the Klang Valley
  • The ICPS solution is currently in development and is projected to be used by an estimated 1 million passengers daily in its first year of operation.

    Proposed extensions

    The KL monorail had proposed to extend its line to Sungai Buloh from its Titiwangsa station but this was not approved. However, extensions for the Kelana Jaya Line and the Ampang Line were approved. Approval was also given to construct a new MRT Sungai Buloh-Kajang Line. The full constructions for the extensions of the Kelana Jaya Line and Ampang Line are confirmed to be finished in 30 April 2016. Meanwhile, MRT Sungai Buloh-Kajang Line is expected to open in 2017. The construction for the second MRT line, MRT Sungai Buloh-Serdang-Putrajaya Line is anticipated to be started by November 2015. The third light rail transit line, the Bandar Utama-Klang Line is now in discussion after it was approved by the government.

    References

    Klang Valley Integrated Transit System Wikipedia


    Similar Topics