Supriya Ghosh (Editor)

King Mountain Wind Farm

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Country
  
United States

Type
  
Onshore

Nameplate capacity
  
278.2 MW

Owner
  
NextEra Energy Resources

Location
  
Upton County, Texas

Make and model
  
Siemens Wind Power

Annual gross output
  
750 GWh

Units operational
  
214

King Mountain Wind Farm

Similar
  
Buffalo Gap Wind Farm, Capricorn Ridge Wind Farm, New Mexico Wind Ene, Wildorado Wind Ranch, Panther Creek Wind Farm

The King Mountain Wind Farm is a 278.2  megawatt (MW) wind farm in Upton County, Texas, United States. 214 Siemens 1.3 MW wind turbines are sited in rows along the south-eastern and north-western edges of a mesa surrounded by deep ravines. The project was completed in December 2001. Annual electricity production is more than 750 GW·h. The wind farm is owned by FPL Energy and the customers for the electricity generated are Reliant Energy (198.9 MW), Austin Energy (76.7 MW) and Texas-New Mexico Power Company (2.6 MW).

Dust, sand and high temperatures place extraordinary demands on the wind turbines. Consequently, the design was modified for the desert-like conditions, providing additional cooling and protection against wind-blown sand.

References

King Mountain Wind Farm Wikipedia