Trisha Shetty (Editor)

KiHa 285 series

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Built at
  
Scrapped
  
2017

Formation
  
3 cars per trainset

Constructed
  
2014

Number built
  
3 vehicles

KiHa 285 series

The KiHa 285 series (キハ285系) is a tilting diesel multiple unit (DMU) train type developed by Hokkaido Railway Company (JR Hokkaido), originally intended for use on limited express services in Hokkaido, Japan. One three-car trainset was completed in September 2014 by Kawasaki Heavy Industries in Kobe, but plans to construct any further KiHa 285 series trains were cancelled the same month, and the trainset built is likely to be scrapped without entering revenue service.

Contents

Design

The KiHa 285 series train uses a new compound tilting system, which tilts the train vehicles by up to 8 degrees using a pendular system (tilt of up to 6 degrees) combined with air suspension tilting (tilt of up to 2 degrees). The train also uses a new motor-assisted ("MA") hybrid diesel traction system, which supplements conventional diesel traction with batteries, inverters, and electric motors. The train was designed to allow a maximum speed of 140 km/h (85 mph) even on curves. Total development costs for the train came to 2.5 billion yen.

Formation

The single three-car set built was numbered HB-901, and formed as shown below.

History

Design work for the prototype KiHa 285 series train commenced in April 2011. On 10 September 2014, JR Hokkaido announced that it was terminating development and production of further trains following the completion of one three-car set built by Kawasaki Heavy Industries. The decision was made following reassessments of priorities by JR Hokkaido, with a shift away from focusing on increasing operating speeds to reduce journey time, with a greater focus on safety and maintenance costs through standardization of its diesel fleet. Ageing diesel trains were instead replaced by KiHa 261 series trains, first introduced in 2000.

The three-car trainset was delivered from Kawasaki Heavy Industries factory in Kobe to JR Hokkaido's Naebo Works in September 2014. After undergoing low-speed testing within the confines of Naebo Works, the set was first test-run on the Hakodate Main Line on 31 October 2014.

Following the cancellation of further production, JR Hokkaido initially considered the possibility of converting the three-car trainset for use as a track and overhead wire inspection train.

The three cars were officially removed from the JR Hokkaido fleet list on 31 March 2015. In April 2016, JR Hokkaido revealed that the complex design of the train made conversion more expensive than the option of purchasing a new purpose-built inspection train, and work to cut up the train commenced in March 2017.

References

KiHa 285 series Wikipedia


Similar Topics