Kazakhstan–China oil pipeline

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Country
  
Kazakhstan, China

From
  
Atyrau

Type
  
oil

General direction
  
west–east

To
  
Alashankou


China-Kazakhstan oil pipeline transports 5.59 mln tons in H1 2019 -  Industry News - Anton Oilfield Services Group - 安东石油
Passes through
  
Aktobe, Kenkiyak, Kumkol, Atasu

The Kazakhstan–China oil pipeline is China's first direct oil import pipeline allowing oil import from Central Asia. It runs from Kazakhstan's Caspian shore to Xinjiang in China. The pipeline is owned by the China National Petroleum Corporation (CNPC) and the Kazakh oil company KazMunayGas.

Contents

History

The construction of pipeline was agreed between China and Kazakhstan in 1997. The first section of pipeline from the Aktobe region's oil fields to the Atyrau was completed in 2003. The construction of pipeline from Atasu, Kazakhstan to Alashankou started in September 2004 and was completed in December 2005. The construction of Kenkiyak–Kumkol section was agreed between Kazakhstan and China on 18 August 2007. This section was completed on 11 July 2009.

The pipeline was developed by the China National Petroleum Corporation (CNPC) and the Kazakh oil company KazMunayGas.

Currently capacity is at 14 million tons per year. The pipeline is expected to reach nominal capacity of 20 million tons per year in 2014.

Technical description

The 2,228 kilometres (1,384 mi) long pipeline runs from Atyrau in Kazakhstan to Alashankou in China's Xinjiang. The Kenkiyak-Atyrau section of the pipeline is 449 kilometres (279 mi) long and has a capacity of 120 thousand barrels per day (~6.0×10^6 t/a). Capacity of the pipeline maybe upgraded to 180 thousand barrels per day (~9.0×10^6 t/a) in the future. The pipeline was built and is operated by MunaiTas a joint venture between CNPC and KazMunayGas.

The Atasu-Alashankou section of the pipeline cost US$700 million. It is 987 kilometres (613 mi) long and has a capacity of 200 thousand barrels per day (~1.0×10^7 t/a). Capacity of this section might be upgraded to 400 thousand barrels per day (~2.0×10^7 t/a) by 2011. The pipeline includes an oil metering station at the Alataw Pass. The pipeline was built and is operated by a joint venture between CNODC and KazTrans Oil JSC. The first oil through this pipeline reached the refinery in August 2006.

The Kenkiyak-Kumkol section is 792 kilometres (492 mi) long. It has initial transportation capacity of 10 million tons per year. This section has reached its full capacity in 2011.

Alashankou–Dushanzi Crude Oil Pipeline

In Alashankou, the pipeline is connected with the Alashankou–Dushanzi Crude Oil Pipeline, which is a 246 kilometres (153 mi) long pipeline connecting the Kazakhstan–China oil pipeline with Dushanzi District. The capacity of pipeline is 10 million tons of oil per year and it supplies mainly the Dushanzi refinery. The pipeline became operational on 21 December 2005 and the first oil through this pipeline reached to the refinery on 29 July 2006. The pipeline is constructed and operated by the China National Petroleum Corporation (CNPC).

Oil supplies

The Kazakhstan–China oil pipeline is supplied from the Aktobe region's fields and from the Kumkol field. In the future, the main supply source will be Kashagan field. The pipeline is used also for the transportation of oil from Russia's western Siberia by connection with the Omsk (Russia)–Pavlodar (Kasakhstan)–Shymkent–Türkmenabat (Turkmenistan) pipeline in Atasu oil terminal. Oil is transported through this pipeline by Russian companies TNK-BP and Gazprom Neft.

References

Kazakhstan–China oil pipeline Wikipedia