Kalpana Kalpana (Editor)

Katwa railway station

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Owned by
  
Indian Railways

Parking
  
No

Opened
  
1913

Owner
  
Indian Railways

Operated by
  
Eastern Railway

Elevation
  
21 m

Phone
  
078280 35898

Platforms in use
  
5

Katwa railway station

Location
  
Station Bazar-Kachhari Road, Katwa, West Bengal India

Line(s)
  
Bandel-Katwa line Barharwa-Azimganj-Katwa loop Burdwan Katwa Railway (Closed for gauge conversion) Ahmedpur Katwa Railway (Closed for gauge conversion)

Structure type
  
Standard (on ground station)

Address
  
Katwa Bardhaman Road, Katwa, West Bengal 713130

Similar
  
Azimganj Junction railway st, Bandel Junction railway st, Radhikapur railway station, Malda Town railway st, New Farakka railway st

Katwa is a Kolkata Suburban Railway Junction Station on the Bandel-Katwa line and the Barharwa-Azimganj-Katwa loop. It is located in Bardhaman district in the Indian state of West Bengal. It serves Katwa and the surrounding areas.

Contents

History

In 1913, the Hooghly–Katwa Railway constructed a 1,676 mm (5 ft 6 in) wide broad gauge line from Bandel to Katwa, and the Barharwa–Azimganj–Katwa Railway constructed the 1,676 mm (5 ft 6 in) wide broad gauge Barharwa-Azimganj-Katwa Loop Line.

The 53 km (33 mi) long 762 mm (2 ft 6 in) wide narrow gauge Burdwan Katwa Railway was opened in 1915 as part of Mc Leod’s Light Railways, taken over by Eastern Railway in 1966 and closed in 2010.

The 53 km (33 mi) long 762 mm (2 ft 6 in) wide narrow gauge Ahmedpur Katwa Railway was opened in 1917 as part of Mc Leod’s Light Railways and taken over by Eastern Railway in 1966. It was closed in 2013 for conversion to 1,676 mm (5 ft 6 in) wide broad gauge and electrification.

Gauge conversion

The track from Burdwan to Katwa is being converted to 1,676 mm (5 ft 6 in) wide broad gauge and electrified. The 26 km Burdwan-Balgona section has been converted to broad gauge in 2013 and EMU train started on the section in February 2014. Conversion of the remaining 26 km Balgona-Katwa section to broad gauge started in 2015.

The track from Katwa to Ahmedpur was closed in 2013 for conversion to 1,676 mm (5 ft 6 in) wide broad gauge but the conversion work has not been completed.

Electrification

Electrification of the Bandel-Katwa line was completed with 25 kV AC overhead system in 1994-96.

Narrow gauge travel

Here is a description of narrow gauge travel (now closed):

References

Katwa railway station Wikipedia