Karun 4 Dam

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Opening date
  
2010

Operator(s)
  
IWPRDC

Height
  
230 m (750 ft)

Surface area
  
29 km²

Impound
  
Karun

Construction cost
  
1.2 billion dollars

Impounds
  
Opened
  
2010

Construction began
  
1997

Karun-4 Dam

Location
  
Chahārmahāl-o-BakhtiyārīIran

Address
  
Chaharmahal and Bakhtiari Province, Lordegan, Lordgan, Iran

Similar
  
Karun‑3 Dam, Masjed Soleyman Dam, Upper Gotvand Dam, Karkheh Dam, Kouhrang 1 Dam

17 4 karun 4 dam


The Karun-4 Dam is an arch dam on the Karun River located at 180 km southwest of Shahr-e-Kord in the province of Chaharmahal and Bakhtiari, Iran. The Karun has the highest discharge of all the Iranian rivers. Its construction is aimed at electric power supply of 2107 million kWh annually and controlling floods in the upper Karun.

Contents

The dam is a concrete double curvature arch-type and 230 metres (750 ft) high from the foundation. The arch dam design is an ideal one for a dam built in a narrow, rocky gorge to hold back water in a reservoir. The dam is curved. Because of the arch shape, the force of the backed up water presses downward against the dam and has the effect of strengthening the dam foundation. The dam withholds a reservoir with a surface area of 29 square kilometres (11 sq mi) and capacity of 2.19 cubic kilometres (1,780,000 acre·ft). The dam's first study was conducted in 1995 and river diversion began in 1997. Concrete pouring began in 2006 and the power plant began producing electricity in November 2010. On December 11, 2010, the second generator for the dam became operational and was connected to the grid. The dam will eventually have an installed capacity of 1,020 MW. The dam was inaugurated on 6 July 2011 by Iranian President Mahmood Ahmadinejad.

Objectives

It was built to fulfill the followings:

  • To produce an average annual hydropower energy as much as 2100 GW-h.
  • To join the cascade dams on the Karun River, hence regulate the flow in order to supply the water required by the industry and agriculture downstream.
  • To control the destructive floods of the Karun River.
  • Cost

    The dam construction was costed 8600 billion Rials financed by public resources including national and local budget, domestic banks facilities, bonds, as well as foreign facilities (finance, loan, etc.).Initial estimate of annual income from the electricity production amounted to 1353 billion Rials (642 Rials per kilo watt hour).

    Build Contractor

    1. Daelim (Korea) + Sato (Japan): Main Civil Works
    2. Ilbau (Austria) + Forman (Iran): Preconstruction Works
    3. Machine Sazi Arak (Iran): Hydraulic Steel Structures
    4. Farab (Iran) + Harbin (China): Mechanical Equipment
    5. Farab (Iran) + Elin (Austria): Electrical I&C and HVAC Equipment
    6. IEO (Iran): GIS Switchgear