The Kapiti Expressway is a four-lane grade-separated expressway through the Kapiti Coast, north of Wellington, New Zealand. As of February 2017, it stretches 18 km (11 mi) from Mackays Crossing north of Paekakariki to just north of Peka Peka, bypassing the former two-lane route through Raumati, Paraparaumu, and Waikanae. Construction of a 14 km (8.7 mi) northern extension to just north of Otaki, bypassing Te Horo and Otaki, is expected to start construction in mid-2017.

Contents

Kapiti Expressway Kapiti expressway to slice through Maori land Stuffconz

Kapiti expressway 47 public day sat 18th feb 2017


Construction

Kapiti Expressway Kapiti expressway closing in on Christmas finish Stuffconz

The section from just south of Mackays Crossing to just south of Poplar Avenue at Raumati South was completed in 2007 with the completion of the Mackays Crossing interchange and rail overbridge, bypassing the existing rail level crossing. The previously constructed four-lane section from Mackays Crossing to Poplar Avenue was upgraded during 2016 and early 2017 to provide an improved road surface. This section of road is constructed on an old peat swamp and develops an uneven surface over time.

Kapiti Expressway Congestion relief coming to Wellington with Kapiti Expressway on

Work on the Raumati to Peka Peka section started in December 2013. The official opening ceremony was held on 16 February 2017, and the expressway opened to traffic in the early hours of 24 February 2017, some three months ahead of the original scheduled date. Some works, including the final layer of asphalt on some sections and roundabouts at the Peka Peka and Poplar Avenue interchanges, will take until mid-2017 to complete.

The Peka Peka to Otaki section will start construction in mid-2017 and will finish in 2020.

Kapiti Expressway Kapiti39s Expressway forges ahead Contractor Magazine

Kapiti Expressway Driving the Kapiti Expressway Alignment In 3 parts 2 From Waikane

Kapiti Expressway MacKays to Peka Peka visual flythrough YouTube

Kapiti Expressway Kapiti Expressway Jan 2016 YouTube

References

Kapiti Expressway Wikipedia


Similar Topics