Harman Patil (Editor)

Kanpur–Delhi section

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Status
  
Operational

Owner
  
Indian Railways

Opened
  
1866

Locale
  
Delhi

Operator(s)
  
North Central Railway for main line and Northern Railway for other lines

Track length
  
Main line: 435 km (270 mi) Kanpur-Tundla231 km (144 mi) Tundla-Delhi204 km (127 mi) Branch lines: Agra-New Delhi 195 km (121 mi)

Track gauge
  
1,676 mm (5 ft 6 in) broad gauge

Electrification
  
25kV 50Hz AC OHLE in 1976-77

Depot
  
Kanpur Central railway station

Rolling stocks
  
Indian locomotive class WAP-4, Indian locomotive class WAG-7

Terminis
  
Delhi Junction railway station, Kanpur Central railway station

The Kanpur–Delhi section is a railway line connecting Kanpur Central and Delhi. This section includes Agra Chord and Etah link. The main line is part of Howrah-Delhi main line and Howrah-Gaya-Delhi line. The Agra-Delhi chord is part of Delhi-Mumbai line and Delhi-Chennai line.

Contents

History

The East Indian Railway Company initiated efforts to develop a railway line from Howrah to Delhi in the mid nineteenth century. Even when the line to Mughalsarai was being constructed and only the lines near Howrah were put in operation, the first train ran from Allahabad to Kanpur in 1859 and the Kanpur-Etawah section was opened to traffic in the 1860s. For the first through train from Howrah to Delhi in 1864, coaches were ferried on boats across the Yamuna at Allahabad. With the completion of the Old Naini Bridge across the Yamuna through trains started running in 1865-66.

The 1,000 mm (3 ft 3 38 in) wide metre gauge Delhi-Bandikui and Bandikui-Agra lines of Rajputana State Railway were opened in 1874.

The Hathras Road-Mathura Cantt line was opened in 1875 and the Agra-Gwalior line was opened in 1881.

The Agra-Delhi chord was opened in 1904. Some parts of it were relaid during the construction of New Delhi (inaugurated in 1927-28).

The 61.80 km (38 mi) long 1,676 mm (5 ft 6 in) wide broad gauge Barhan-Etah line was constructed in 1959.

The 54.3 km (34 mi) long 1,676 mm (5 ft 6 in) wide broad gauge Ghaziabad-Tughlakabad line, including bridge across Yamuna, was completed in 1966.

Electrification

The Kanpur-Panki sector was electrified in 1968-69, Panki-Tundla in 1971-72, Tundla-Aligarh-Ghaziabad in 1975-76, Ghaziabad-Nizamuddin-New Delhi-Delhi in 1976-77, Tilak Bridge-Fairdabad in 1982-83, Raja ki Mandi-Agra-Dhoulpur in 1984-85, Tundla-Yamuna Bridge in 1998-99 and Yamuna Bridge-Agra in 1990-91.

Loco sheds

Kanpur Central electric loco shed accommodates WAP-4 and WAG-7 electric locos. Agra diesel loco shed houses WDS-4 locomotives. The shed serves the requirement of shunting locos at different stations and Jhansi Workshop. Ghaziabad electric loco shed serves the Delhi area. It housed 47 WAP-1 locos in 2008. It also has WAM-4, WAP-4, WAP-5, WAP-7 and WAG-5HA locos.

Speed limits

The entire Howrah-Delhi line, via Howrah-Bardhaman chord and Grand Chord is classified as a "Group A" line which can take speeds up to 160 km/h.

Passenger movement

Kanpur Central and Delhi on the main line, and Agra Cantonment and Mathura Junction on the Agra-Delhi chord are amongst the top hundred booking stations of Indian Railway.

References

Kanpur–Delhi section Wikipedia