Rahul Sharma (Editor)

Kaligandaki A Hydroelectric Power Station

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Country
  
Nepal

Purpose
  
Power

Opening date
  
2002

Opened
  
2002

Impound
  
Gandaki River

Location
  
Mirmi, Syangja

Status
  
Operational

Height
  
44 m

Construction began
  
1997

Kaligandaki A Hydroelectric Power Station

Official name
  
Kaligandaki A Hydroelectric Power Station

Owner
  
Nepal Electricity Authority

Construction cost
  
354.8 million USD (50 billion Nepali Rupees)

Similar
  
Upper Tamakoshi Hydroele, Pharping Hydropower Station, Marshyangdi, Chilime Hydropower Plant, West Seti Dam

Kaligandaki A Hydroelectric Power Station is situated near Mirmi of Syangja District about 300 km to the west of Kathmandu and 100 km from Pokhara in the same direction in Nepal. The dam and headworks are situated on the Gandaki River at the confluence of the Andhikhola whereas the power house is located downstream, around a bend in the river, in Beltari (About 7 km towards the South-East of Mirmi). A 5.9 km (3.7 mi) long headrace tunnel connects the reservoir to the power station which contains three 48 MW Francis turbine-generators. Owner and operator of the power plant is Nepal Electricity Authority.

It is a run-of-river type of project and currently is the largest power plant of any kind in Nepal with an installed capacity of 144 MW. Construction started in the year 1997 and was completed in the year 2002. The three turbine & generators Toshiba Make were commissioned in March, April and May 2002. It was constructed primarily to curb the ever increasing energy demand at that time and eliminate loadshedding prevalent due to the imbalance in demand and supply of energy. It was constructed with the financial aid of the Asian Development Bank with total costs reaching US$354.8 million (50 billion NPR (approx)).

Transmission line

The power generated by the three turbines is evacuated to the central grid via a 132kV single circuit, a 66 kilometres (41 mi) long transmission line to Pokhara, and a 44 kilometres (27 mi) double circuit transmission line to Butwal. The electricity is sent to Lekhnath Municipality and Butwal (known as Butwal-1 and Butwal-2). A sub-station has been constructed in Lekhnath Municipality, Kaski district and the existing Jogikuti substation in Butwal has been upgraded.

References

Kaligandaki A Hydroelectric Power Station Wikipedia