Status
  
Operational

Owner
  
Indian Railway

Opened
  
1894

Locale
  
Jharia Coalfield, Jharkhand

Track gauge
  
1,676 mm (5 ft 6 in) Broad Gauge

Electrification
  
1960-61 onwards with 25 kV AC overhead

Operators
  
Eastern Railway zone, South Eastern Railway zone

The Jharia Coalfield rail network is a series of railway lines covering the Jharia Coalfield lying between the Grand Chord line on the north and the Damodar in the south.

Contents

History

It was possible to develop mining in the Jharia Coalfield in the late nineteenth century primarily because of the introduction of railways. East Indian Railway Company extended the Grand Chord to Katrasgarh via Dhanbd in 1894.

The Bengal Nagpur Railway extended its then mainline, the Nagpur-Asansol line, to Netaji SC Bose Gomoh, on EIR’s Grand Chord, in 1907. The Mahuda Junction-Chandrapura branch line was opened in 1913.

The District Gazetteer of Manbhum noted that : "There is a network of railway line in this district passing through colliery area. Grand Chord Line of the Eastern Railway and branch line of South Eastern Railway pass though this district from Gomoh Junction two railway line one of the Eastern Railway and another of the south Eastern Railway branch off, one going to Dehri on Sone (Shahabad) via Barkakana and another from Gomoh to Adra (Purulia district). There are branch lines in both the railway for carrying coal to different places in the country."

EIR had four major sections:
(1) Kumardhubi-Gomoh section,
(2) Pradhankhanta-Pathardih section (15 km), opened in 1913,
(3) Dhanbad-Phularitand section (21.6 km), opened in 1894 to Katrasgarh and extended to Phularitand in 1924,
(4) Dhanbad-Pathardih section opened in 1903.

BNR had one-section from Sudamdih to Gomoh.

Electrification

Electrification of the stretch of mainline of this section from Asansol to Netaji SC Bose Gomoh was completed in 1960-61.

Stretches of railway track in the Jharia Coalfield were electrified from time to time. Dhanbad-Kusunda-Tetulmari was electrified in 1961-62. The Santaldih-Pathardih-Sudamdih-Jamadoba sector was electrified in 1965-66. The Bhojudih-Netaji SC Bose Gomoh stretch was electrified in 1985-86. The Netaji SC Bose Gomoh-Chandrapura-Bhandaridah-Rajabera sector was electrified in 1986-87. The Chandrapura-Jamuniatanr-Mahuda sector was electrified in 1986-87. The Tupkadih-Talgoria sector was electrified in 1987-88.

References