Puneet Varma (Editor)

JAGAL

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Country
  
Germany

General direction
  
north–south

Diameter
  
1.2 m

State
  
Brandenburg Thuringia

Type
  
natural gas

Commissioned
  
1999

From
  
Lebus (connected to Yamal-Europe pipeline)

To
  
Rückersdorf (connected to STEGAL pipeline)

Passes throughs
  
Mallnow, Baruth/Mark, Bernau bei Berlin

Jagal the act of killing full movie


JAGAL (Jamal-Gas-Anbindungsleitung) is a German section of the Yamal-Europe pipeline. The pipeline is used for the Russian natural gas import and it is owned and operated by Gascade Gastransport GmbH. It runs from the Polish–German border at Lebus near Frankfurt (Oder) to Rückersdorf. In Rückersdorf JAGAL is connected with STEGAL pipeline carrying gas further west. In Bernau JAGAL is connected with the Verbundnetz Gas AG-operated long-distance gas pipeline No. 302.

Construction of the JAGAL pipeline started in 1995, when a double duct between Lebus and Górzyca in Poland was laid under Oder and 11-kilometre (6.8 mi) long connection from Lebus to Mallnow compressor station was built. This section was completed in 1996. The 97-kilometre (60 mi) second section of JAGAL from Mallnow to Baruth/Mark was completed in 1997. 230-kilometre (140 mi) JAGAL II from Baruth to Rückersdorf was constructed in 1999. The section from the border to Mallnow has a diameter of 1,400 millimetres (55 in) while rest of the pipeline has a diameter of 1,400 millimetres (55 in). It has a capacity of 840 billion cubic feet (24×10^9 m3) of natural gas per year.

References

JAGAL Wikipedia