Island Falls is a hydroelectric power station operated by SaskPower, a Saskatchewan crown corporation. It is located on the Churchill River, about sixty miles (100 km) northwest of Flin Flon, Manitoba, Canada.

Contents

Island Falls was the first hydroelectric power plant in Saskatchewan. It was built between 1928 and 1930 by the Churchill River Power Company, a subsidiary of Hudson Bay Mining and Smelting, to provide electricity for the HBM&S mining operations at Flin Flon and Cold Lake, Manitoba.

The drainage area above the power site covers much of northwest Saskatchewan, about 80,000 square miles (210,000 km2). The drainage basin contains several large lakes providing natural reservoirs, the main one being Reindeer Lake (2,300 sq.mi.).

As part of the consolidation of generation sources in the province, SaskPower purchased the plant from HBM&S in 1981, which continued to operate it for several years. Since 1985 the plant is entirely owned and operated by SaskPower.

Construction

The construction of the power plant was difficult, as transportation routes did not exist north of the rail-head in Flin Flon. In summer, forty-three miles of road were built between a series of six lakes, and scows installed on those lakes. Heavy hauling had to take place during a two-month period in late winter when the lake ice was thick enough. Construction material was carried a distance of 72 miles (115 km) by trains of up to six sleighs hauled by 100 hp (75 kW). Linn tractors. The average load was about 77 tons per train, while the total freight carried over two winters was 35,000 tons. At that time, it was considered to be the most ambitious winter hauling enterprise ever undertaken in Canada.

Power for construction was supplied by two small turbines at a temporary hydro-electric plant at Spruce Falls, 14 miles (22 km) down river (east), where Kipahigan (Barrier) Lake drains into the Churchill River.

The Island Falls power dam spanned the main river channel at Big Eddy Falls, where there was a drop of 56 feet (17 m). In addition, a number of earthen dams were built along the margin of the head pond (fore bay) to prevent overflow. About one mile (1.6 km) south, a 900-foot (275 m) concrete spillway dam known as “A-dam” was built across a low area on dry land later to be flooded. The fore bay was filled during July 1930, completely submerging the three low falls from which Island Falls gets its name. In August 1930, A-dam was opened and the massive flood of escaping water flushed out a second channel, thus creating an island. The stretch of river affected by the Island Falls development extends from Big Eddy Falls, where the power plant is located, to Mussena Rapids, a distance of approximately thirteen miles (20 km).

The power plant

Initially, the power plant held the two 1,250 hp (930 kW). units brought up from Spruce Falls, and three large turbine units each rated at 14,000 hp (10,000 kW). under a 56-foot (17 m) head at 163.6 rpm. These vertical generators put out 6,600 volts, which was stepped up to 110,000 volts for transmission over 58 miles (93 km) of line to Flin Flon and the 45-mile (72 km) branch line to the Sherritt-Gordon Mine at Cold Lake. The first transmission of electricity to Flin Flon took place in June 1930. In following years, additional 19,000 hp (14,000 kW). units were added: Unit 4 in 1936, Unit 5 in 1938, Unit 6 in 1947, and Unit 7 in 1959. The total output of the power plant is now well over 100,000 hp (75,000 kW).

SaskPower continues to modernize and maintain the plant, with re-runnering and upgrade of controls for Units 4,5 and 6 under way as of 2012. The utility currently projects that Island Falls generating units will continue in operation into their 9th decade before retirement.

The settlement of Island Falls

From 1929 to 1967, Island Falls was also the name of the small, remote settlement of about two hundred people located on the island near the power plant.[1] Called “The Camp” by its residents, it was home to the families of operators, electricians, machinists, administrators, labourers, and men of many other skills employed by the Churchill River Power Company.

The original buildings dating from 1929 were made from locally sawn spruce and pine trees. They were distinctively clad with vertical, bark-covered slabs on the walls, roofed with black tarpaper, insulated with sawdust, fully plumbed, and electrically heated. During the 1940s, the old dwellings were replaced by second-generation houses. These fully modern houses, including utilities, were provided free to employees.

Winters being long and cold, the community had facilities necessary for self-sufficiency, including a two-room school, gymnasium, cinema, curling rink, and hockey arena. A “Community Club” was generously supported by the company, so residents were regularly treated to movies and social gatherings. Special days such as Christmas and Dominion Day (July 1) were important celebrations. Summers days were warm and long. Most people spent considerable time out-of-doors and made good use of the community boathouse. Many families had summer cottages along the river, some of which are still in use.

Transportation

Provisions such as canned and frozen foods were available at a company commissary, while fresh food was flown in by airplane. The Community had always been serviced by air, but ‘freeze-up’ of the river in the fall and ‘break-up’ of the ice in spring prevented aircraft from landing for weeks at a time. Surface transportation was essential, therefore the original route from the construction period was maintained. This route consisted of a series of lakes on which canoes and larger boats were moored. On the portages between the lakes, old vehicles were stationed. Passengers and freight could move to or from Flin Flon in about a day. The “lakes and portages” route continued to be used regularly into the 1950s.

Linn tractor trains continued to be used for transporting heavy supplies in winter over the frozen lakes, but in the 1940s much faster Bombardier snowmobiles began to carry mail and passengers. By the 1950s, many families had purchased older-style automobiles and were able to travel independently to Flin Flon for visiting, shopping and recreation. In 1967, a permanent road to Flin Flon via Pelican Narrows and the Hansen Lake Road was completed. Ironically, the community of Island Falls closed down that year.

The closing of the settlement

By 1967, when technology permitted the power plant to be run by remote control, HBM&S management decided it was no longer feasible to support the settlement near the power plant. As a result of automation, CRP Co. employees and their families were moved to jobs in Flin Flon or into retirement. Thereafter, plant operators drove to Island Falls to work their shifts and were accommodated in a staff house.[2]

The company houses and other buildings such as the community hall remained vacant until the power plant was taken over by SaskPower in 1981. By 1988, all the buildings had been removed or demolished. Except for the two-storey commissary, which now serves as a staff house, all that remains of the settlement of Island Falls are the sidewalks leading to the places where houses once stood.