Suvarna Garge (Editor)

Isimba Hydroelectric Power Station

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Country
  
Uganda

Status
  
Under construction

Impounds
  
Victoria Nile

Construction cost
  
590 million USD

Purpose
  
Power

Opening date
  
2016 (Expected)

Elevation
  
1,000 m

Impound
  
White Nile

Isimba Hydroelectric Power Station httpsconstructionreviewonlinecomwpcontentup

Location
  
Isimba, Kamuli District

Similar
  
Bujagali Hydroelectric Power St, Ayago Hydroelectric Power St, Nalubaale Hydroelectric Power St, Nyagak Hydroelectric Power St, Bujagali Falls

Isimba Hydroelectric Power Station is a 183.2 megawatts (245,700 hp) hydroelectric power project under construction in Uganda.

Contents

Location

Isimba Hydroelectric Power Station M7 Breaks Ground For 5677m Isimba Hydro Power Project Red Pepper

The power station is located at the village of Isimba on the Victoria Nile, in Kamuli District. This is approximately 44 kilometres (27 mi), by road, north of the Bujagali Hydroelectric Power Station.

Overview

Isimba Hydroelectric Power Station Chinese to fund and build Uganda39s Isimba hydroelectric dam Asian

The contract for a feasibility study and preparation of tender documents, worth US $3.8 million, was awarded to a consortium consisting of the engineering firms Fichtner (lead) and Norplan. A local Ugandan company, Kagga & Partners, was a sub-consultant to the consortium. Initial planned capacity at Isimba was to be at least 100 megawatts (130,000 hp).

Isimba Hydroelectric Power Station Minister Inspects Isimba Hydropower Project

In July 2013, Ugandan media reported that the construction contract had been awarded to the China International Water & Electric Corporation, a Chinese government-owned power company. The generation capacity had been increased to 183.2 megawatts. Construction is expected to last 34 months.

Construction costs

Isimba Hydroelectric Power Station Isimba Hydropower Project Power Technology

The total project cost was originally estimated at US $350 million. In 2008, the Ugandan government secured a loan from Exim Bank of India to fund the construction. In April 2013, Ugandan print media reported that the government of India had extended a credit line worth US $450 million (about UGX:1.1 trillion) for construction of the dam.

In July 2013, media reports indicated that the cost of the dam had risen to US $570 million (about UGX:1.4 trillion), funded by a loan from the Export-Import Bank of China. In March 2015, the Ugandan Parliament authorized the Ugandan government to borrow US$482.5 million (about UGX:1.4 trillion) from China Exim Bank at 2 percent annual interest repayable over 20 years, with a five-year grace period. Uganda will contribute the remaining US$107 million to the project, for a total cost of US$589.5 million. A new 132 kilovolt transmission line will be constructed to evacuate the generated power and integrate it into the national grid at the Bujagali Power Station.