Opening date
  
1972

Height
  
60 m (200 ft)

Creates
  
Iron Gate I Reservoir

Opened
  
1972

Impound
  
Danube

Impounds
  
Danube River

Length
  
1,278 m (4,193 ft)

Address
  
34, Novi Sip, Serbia

Construction began
  
1964

Iron Gate I Hydroelectric Power Station

Location
  
Iron Gate Serbia Romania

Hours
  
Closed now Wednesday7AM–3PMThursday7AM–3PMFriday7AM–3PMSaturdayClosedSundayClosedMonday7AM–3PMTuesday7AM–3PM

Similar
  
Iron Gates, Ada Kaleh, Trajan's Bridge, Tabula Traiana, Rock sculpture of Decebalus

Revitalizacija 5 agregata he djerdap 1 final 24 min


The Iron Gate I Hydroelectric Power Station (Romanian: Porţile de Fier I, Serbian: Ђердап I, Đerdap I) is the largest dam on the Danube river and one of the largest hydro power plants in Europe. It is located on the Iron Gate gorge, between Romania and Serbia.

Contents

The Romanian side of the power station produces approximately 5.4 TWh annually, while the Serbian side of the power station produces 5.65 TWh. The discrepancy in power output between the two halves is due to the generating equipment. While Serbia's equipment is newer and thus more efficient (thereby generating more power), it is proving more unreliable; resulting in increased downtime for maintenance/repairs, and consequently lower annual power output overall.

HistoryEdit

The project started in 1964 as a joint-venture between the governments of Romania and Yugoslavia for the construction of a major dam on the Danube River which would serve both countries. At the time of completion in 1972, it was one of the largest hydroelectric power stations in the world with twelve units generating 2,052 MW, divided equally between the two countries at 1,026 MW each.

The small inhabited island of Ada Kaleh was submerged during the construction.

ModernizationEdit

As the original turbines' 30 years lifespan came to an end, in 1998 the Romanian half of the dam started a program of modernization. As part of this program, the first of the turbines was stopped in 1999. By 2007 the program was completed and the Romanian half of the dam's operations were back to full capacity. The nominal capacity of each of the six units was increased from 171 MW to 194.3 MW, thus giving an installed capacity of 1,166 MW and increasing the entire power generation capacity of the dam to 2,192 MW. On the Serbian part of the dam, modernization started in July 2008; so far Units 4 and 6 have been modernized, and revitalization has started on Unit 5. The units are being upgraded with the help of Russian company Power Machines from Saint Petersburg (www.power-m.ru), as well as their subcontractors with the participation of eleven domestic companies.

In addition to the upgrades, the Serbian side is planning on building a new, smaller power station, called Iron Gate III (Serbian: Ђердап III, Đerdap III).

References

Iron Gate I Hydroelectric Power Station Wikipedia