Interstate 840 (North Carolina)

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Existed:
  
2011 (2011) – present

Counties:
  
Guilford

Length
  
9.29 km

West end:
  
US 70 in Greensboro

Constructed
  
2011

Interstate 840 (North Carolina)

West end:
  
I‑40 / I‑73 / US 421 in Greensboro

East end:
  
Future I‑73 / Bryan Boulevard in Greensboro

East end:
  
I‑40 / I‑85 / I‑85 Bus. in Greensboro

Interstate 840 (I-840) is an Interstate Highway in the U.S. state of North Carolina. It is currently in two sections traversing 5.77 miles (9.29 km) total in Guilford County; when completed, it will form the northern section of the Greensboro Urban Loop.

Contents

Map of I-840, Greensboro, NC, USA

Route description

I-840 currently exists in two segments that will eventually form the northern bypass around Greensboro.

The western segment, a divided six-lane urban freeway, begins at the interchange of I-40/I-73/US 421 and goes north for 3.56 miles (5.73 km) to Bryan Boulevard, where it terminates. Currently, this segment is signed as "Future" because it does not reconnect to another U.S. Route or Interstate; however, it has been a federally recognized interstate since 2011 despite the current banner. The entire route is in concurrency with I-73.

The eastern segment, a divided four-lane rural freeway, begins at US 70 (Burlington Road) and goes south for 2.21 miles (3.56 km) to the I-40/I-85/I-85 Bus interchange, its eastern terminus. The entire route is in concurrency with I-785. The eastern segment is currently unsigned with plans of it remaining as a hidden designation for I-840 until it connects with the western segment.

Both sections have a maximum speed limit of 65 miles per hour (105 km/h).

History

I-840 first appeared in the early 2000s as a proposed routing for the northern half of the Greensboro Urban Loop. In 2002, the first segment opened between US 70 and I-40/I-85; however, it was unsigned and designated as SR 3269; by 2006, Future I-840 signage was added at the US 70 interchange. In December 2007, a second segment opened along its routing between I-40/US 421 and Bryan Boulevard and was signed as Future I-73/I-840. In 2010, NCDOT submitted its official request, to both the AASHTO and the FHWA, to designate the two existing segments of the northern half of the Greensboro Urban Loop as I-840 and the 15.26-mile (24.56 km) unbuilt portion as Future I-840. AASHTO approved the request on October 29, 2010 followed by FHWA on August 2, 2011. On September 2, 2011, NCDOT certified the route change establishing I-840.

Construction on the northern half of the Greensboro Urban Loop resumed in 2013 with the 3.8-mile (6.1 km) segment, between Bryan Boulevard and Battleground Avenue (US 220), which will be signed as I-840. In late 2014, a 5.5-mile (8.9 km) segment, between US 29 and US 70, also began construction; however, it will be signed as I-785 with I-840 as a hidden designation.

Future

As of 2014, there are four segments of the northern half of the Greensboro Urban Loop to be completed.

  • Western Loop (between Bryan Boulevard and US 220) — Construction began on the 3.8-mile (6.1 km) six-lane segment in 2013. At a cost of $123 million, it is expected to be completed in Spring 2018.
  • Western Loop (between US 220 and Lawndale Drive) — This 1.7-mile (2.7 km) six-lane segment is fully funded, at a cost of $54 million.
  • Eastern Loop (between Lawndale Drive and US 29) — This 6.0-mile (9.7 km) six-lane segment is fully funded. At a cost of $162 million, it will have interchanges at Yanceyville Street and North Elm Street.
  • Eastern Loop (between US 29 and US 70) — Construction began on the 5.5-mile (8.9 km) four-lane segment in late 2014. At a cost of $119 million, it will have an interchange at Huffine Mill Road. The project is expected to be completed in Spring 2018.
  • Segments along the western loop will be designated as I-840 upon opening; segments along the eastern loop will have a hidden I-840 designation until it joins with the western loop, fully designating the entire northern half of the Greensboro Urban Loop. Long term plans call for two additional interchanges along I-840: Fleming–Lewiston Road (SR 2136) and Cone Boulevard (SR 2565). Plans for both interchanges have existed since 2004; however, because both are to be constructed after the I-840's completion, there is no current time table or funding for these two projects at this time.

    Exit list

    The entire route is in Greensboro, Guilford County.