Country Canada Commission date December 1, 2002 | Status Operational Construction began 11 July 2002 | |
![]() | ||
Owner(s) BPC Generation Infrastructure Trust,Cameco Corporation andTransCanada PipeLines Limited Units operational 5 Vestas V80-1.8MW wind turbines |
Tyr tactical huron wind shirt
Huron Wind is the first commercial wind farm in Ontario. It is located in the village of Inverhuron, Ontario near Tiverton, and consists of 5 Vestas V80-1.8MW wind turbines. It is next to the Bruce Power Visitor Centre, within sight of the Bruce Nuclear Generating Station, and adjacent to the larger Enbridge Ontario Wind Farm. Groundbreaking was on July 11, 2002 and it was declared officially in service on December 1, 2002.
Contents
The project is owned by a consortium of BPC Generation Infrastructure Trust, Cameco Corporation and TransCanada PipeLines Limited.
Huron wind
References
Huron Wind Wikipedia(Text) CC BY-SA