Scotland

Status
  
Decommissioned

Reactor type
  
Magnox

Opened
  
1964

Decommission date
  
31 March 1990

Location
  
North Ayrshire

Construction began
  
1957 - 1964

Reactor supplier
  
GEC

Phone
  
+44 1294 824000

Hunterston A nuclear power station

Address
  
Hunterston, West Kilbride KA23 9RA, UK

Owners
  
South of Scotland Electricity Board, Scottish Nuclear, Magnox Ltd, Nuclear Decommissioning Authority

Similar
  
Chapelcross nuclear power sta, Trawsfynydd nuclear power sta, Oldbury Nuclear Power St, Dungeness Nuclear Power St, Winfrith

Hunterston A nuclear power station was a Magnox power station located at Hunterston in Ayrshire, Scotland, adjacent to Hunterston B and is currently being decommissioned.

Contents

HistoryEdit

Construction of the power station, which was undertaken by a consortium of GEC and Simon Carves, began in 1957 and the facility was opened by Her Majesty Queen Elizabeth, the Queen Mother on 22 September 1964. Hunterston A had two Magnox reactors capable of generating 180 MWe each. The reactors were supplied by GEC and the turbines by C.A. Parsons & Company. The main civil engineering contractor was Mowlem.

The Magnox reactors used natural uranium fuel (in magnox alloy 'cans') within a graphite core, and were cooled by carbon dioxide gas. Each reactor, which consisted of more than 3000 fuel channels, was enclosed in a steel pressure vessel. Eight boilers, known as Steam Raising Units, were located around each reactor. An outer building, mainly of glass, provided weather protection. The six 60 MW generators were located in an adjoining turbine hall.

The Hunterston A reactor design was unique in that each was raised up to a height of over 10 metres to enable refuelling to take place from underneath. This meant that gravity assisted the process of used fuel removal, and avoided the need for lifting machinery to be inserted into the active core for on-load refuelling.

In later years of operation the reactors were derated to 150 MWe each. This was to slow the corrosion of steel components which, at the original higher temperatures, could have compromised reactor life.

The construction of Cruachan Power Station, a pumped-storage hydroelectric dam and power station, was linked to that of Hunterston A, to store its surplus night-time generated electricity.

Shutdown and decommissioningEdit

Hunterston A closed in 1990, with Reactor 2 shutting down on 31 December 1989 and Reactor 1 on 31 March 1990, immediately prior to the splitting of SSEB into Scottish Power and Scottish Nuclear.

OwnershipEdit

From construction to closure in March 1990, the power station was owned and operated by South of Scotland Electricity Board. As part of the privatisation of the Scottish electricity generators, Hunterston A was transferred, with the adjacent Hunterston B, to the new state owned company Scottish Nuclear. In 1996 upon privatisation of the UK nuclear industry, the site was transferred, this time on its own to the state-owned Magnox Electric. In April 2005, the NDA took over ownership and place the site with its Site Licence company, Magnox North Ltd.

References

Hunterston A nuclear power station Wikipedia