Hongyanhe Nuclear Power Plant

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Official name
  
红沿河核电站

Status
  
Operational

Opened
  
28 June 2007

Country
  
China

Reactor type
  
PWR

Construction began
  
2007

Hongyanhe Nuclear Power Plant Hongyanhe nuclear power station in NE China Global Times

Location
  
Donggangzhen, Wafangdian, Dalian, Liaoning

Owner(s)
  
Liaoning Hongyanhe Nuclear Power Co. Ltd.

Make and model
  
China General Nuclear Power Group

Similar
  
Tianwan Nuclear Power Pl, Qinshan Nuclear Power Pl, Daya Bay Nuclear Power Pl, Sanmen Nuclear Power St, Haiyang Nuclear Power Pl

The Hongyanhe Nuclear Power Plant (红沿河核电站) is one of the newest Nuclear power plants in the world. It is located in Donggang Town, Wafangdian in the Liaoning Province of China. The site is within the Prefecture-level city of Dalian, 104 kilometres (65 mi) north of Dalian City proper. The first unit started commercial operations in June 2013.

Hongyanhe Nuclear Power Plant Northeast China39s first nuclear power plant starts operation The

Phase I consists of four CPR-1000 reactors, which is a design developed by China from the Framatome-designed PWRs at the Daya Bay Nuclear Power Plant.

Hongyanhe Nuclear Power Plant Top Plant Hongyanhe Nuclear Power Plant Liaoning Province China

Phase II is the first construction of two ACPR1000 reactors, a further development of the CPR-1000. This reactor will include a core catcher and double containment as additional safety measures.

Hongyanhe Nuclear Power Plant Hongyanhe nuclear power starts test operationChina Economic Net

Progress

Hongyanhe Nuclear Power Plant staticprogressivemediagroupcomuploadsimagelibr

The project was approved by the National Development and Reform Commission in April 2006, and projected to cost 23 billion yuan ($2.88 billion USD) for the first two units. The cost will be shared between the China Power Investment Corporation, the China General Nuclear Power Group and two Liaoning companies. Liaoning Hongyanhe Nuclear Power Co. Ltd. is managing the construction and will be the operator of the plant once it goes online.

Hongyanhe Nuclear Power Plant Grid connection for Hongyanhe 4

Construction started in summer of 2006 with excavation of two large holes that will have the reactors put in them and a containment built around them. 'First concrete' for the first unit was poured in August 2007. 'Ground breaking' ceremony was held on 28 July 2010 for starting the work of two 1000 MWe CPR-1000 pressurized water reactors of phase II.

Hongyanhe Nuclear Power Plant Succeeding in Dome Lifting for Hongyanhe Nuclear Power Plant Unit

On 17 February 2013 Hongyanhe 1 was connected to the grid, having started criticality testing on 16 January 2013. It began commercial operation on 6 June.

On 23 November 2013 Hongyanhe 2 was connected to the grid.

Hongyanhe 4 achieved first criticality on 5 March 2016, was connected to the grid on 1 April 2016, and entered commercial operation on 20 September 2016.