Puneet Varma (Editor)

Honam High Speed Railway

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Native name
  
호남고속철도

System
  
Korea Train Express

Locale
  
South Korea

Owner
  
Korail

Type
  
High-speed rail

Status
  
Operational

Opened
  
April 1, 2015

Honam High Speed Railway httpsiytimgcomviIqXgCZRjxEhqdefaultjpg

Line number
  
102 (Korea Rail Network Authority)

Terminis
  
Osong Station, Cheongju, Mokpo Station, South Jeolla Province

S korea s honam high speed railway set to open in march ytn


The Honam High Speed Railway (Honam HSR) is a high-speed railway between Osong (on the existing Gyeongbu High Speed Railway) and Mokpo in South Korea. The line is a part of Korail's Korea Train Express (KTX) system, accelerating Seoul-Mokpo and Seoul-Gwangju KTX high-speed services which currently use the existing conventional Honam Line. On April 1, 2015, the line was inaugurated by the South Korean President Park Geun-hye with the attendance of 1200 invited guests and members of the public at Gwangju Songjeong Station in Gwangju, the line's terminus. The line diverges from Osong Station on the Gyeongbu High Speed Railway, and stops at Gongju, Iksan, Jeongeup Stations. Journey times between Seoul and Gwangju has been cut from 2 h 40 min to just 90 min, making daily commuting possible. The Honam HSR is intended to bring business, and economic opportunities to the province of Jeollanam-do, which has seen slower development than other parts of South Korea. The line has been open to the public since April 2, 2015 for revenue service.

Contents

Origins of the project

The most progressed plans for a second high-speed line were for the Honam High Speed Railway, a connection from Seoul to Mokpo in southwest Korea, accelerating the service on the existing route that was eventually established in KTX's first phase.

The first feasibility study in 2003 came to the conclusion that the construction of a full line is not justified by demand, and proposed a two-stage construction. The first stage, to be realised by 2015, would involve a connection from a second Seoul terminus in the southeast part of the city to the Gyeongbu HSR, and a branch from the Gyeongbu HSR to Iksan, paralleling the existing Honam Line. The second phase, to be realised by 2020, would include the separate tracks on the section paralleling the Gyeongbu Line, and the extension from Iksan to Gwangju and Mokpo, paralleling the existing Honam Line. The cost of the entire project was estimated at 10,378.6 billion won.

On January 14, 2005, Prime Minister Lee Hae Chan met local representatives in Gwangju, who requested an early implementation of the project. Lee pointed to the failure of the first phase of the KTX in meeting ridership forecasts during its first months, expressed skepticism regarding the profitability of the Honam HSR, and described it as a long-term project. However, in December the same year, in the light of low approval in the affected provinces, the government reversed its stance and agreed to complete the project to Gwangju by 2015.

In plans made official in August 2006 in spite of a benefit-cost ratio below 1, the budget for the 182.75 km first stage (from the new Osong Station on the Gyeongbu HSR to Gwangju) was set at 8,569.5 billion won. The second stage, the 48.74 km remaining to Mokpo, was to be finished by 2017 with a budget of 2,002.2 billion won. The altogether 230.99 km, 10,571.7 billion won project would enable Seoul-Mokpo travel times of 1 hour 46 minutes. Ahead of the 2007 Presidential elections, eventual winner Lee Myung-bak promised to accelerate the project by 3 years (with the first section finished by 2012). While this date was deemed unrealistic by the responsible ministry, a one-year acceleration (first phase in 2014) was announced in January 2009. The Osong-Iksan section of the first phase is also intended for use as high-speed test track for rolling stock development, to be fitted with special catenary and instrumented track.

The project is financed to 50% by direct government funds and 50% loans.

Construction

By December 2009, construction began on three sub-sections of the 182 km line from Osong to Gwangju, which shall enable Seoul-Gwangju travel times of 1 hour 30 minutes. The ground-breaking ceremony was held at Gwangju·Songjeong Station in the attendance of President Lee Myung-bak on December 4, 2009, when total project costs were estimated at 11.3 trillion won (US$9.8 billion). As of September 2010, progress was 9.6% of the project budget then estimated at 10,490.1 billion won for the first phase, while the estimate for the entire line stood at 12,101.7 billion won.

The entire line from Osong to Mokpo includes a total of 111.7 km of viaducts (48.35%) and 49.12 km of tunnels (21.26%).

Stations

Trains will stop at six stations along the line: