Suvarna Garge (Editor)

Hill to Hill Bridge

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Crosses
  
Lehigh River

Other name(s)
  
Route 378 Bridge

Opened
  
1924

Location
  
Bethlehem

Bridge type
  
Arch bridge, Truss bridge

Official name
  
Hill to Hill Bridge

Construction started
  
1911

Total length
  
496 m

Body of water
  
Lehigh River

Hill to Hill Bridge

Carries
  
4 lanes of PA 378 and 2 sidewalks

Locale
  
Bethlehem, Pennsylvania

Design
  
concrete arch truss bridge

Address
  
Hill to Hill Bridge, Bethlehem, PA 18018, USA

Similar
  
Philip J Fahy Memorial, Minsi Trail Bridge, Lehigh Canal, Sand Island Park, Martin Tower

Golden gate bridge


The Hill to Hill Bridge is a road crossing of the Lehigh River linking the south and north sides of Bethlehem, Pennsylvania. It was completed in 1924. It carries Pennsylvania Route 378 from Wyandotte Street on the city's south side to a series of ramps and viaducts on the north side. It replaced a two-lane covered bridge and eliminated several grade crossings of three railroads on the two banks of the Lehigh River. It is located in the Central Bethlehem Historic District, listed on the National Register of Historic Places in 1972, with a Boundary Increase in 1988.

Contents

Prior South Side-North Side crossing

Prior to Bethlehem's incorporation as a city in 1917, the north side and the south side were independent municipalities. During the latter part of the 1910s, three bridges crossed between Bethlehem and South Bethlehem: the Minsi Trail bridge, the New Street bridge, and the Main Street covered bridge. The Main Street bridge was narrow and was regularly damaged by floods and ice. It crossed several tracks of the Lehigh Valley Railroad and the Reading Railroad on the south side as it led to Wyandotte Street. The Pacific Hotel stood between the southern portal to the covered bridge; the adjacent image shows the active freight and passenger railroad tracks travelers crossed to reach the bridge. To the right (not visible) was Union Station (or Union Depot), the passenger station of the Lehigh Valley and Reading Railroads with service to Buffalo, Harrisburg, New York (Jersey City), and Philadelphia.

On the north side, it crossed the Lehigh Coal and Navigation Canal and the tracks of the Central Railroad of New Jersey before continuing up Seminary Hill (named for the Moravian Church's Female Seminary) to the Main Street business district.

Construction 1921-1924

Community leaders found the covered bridge to be a barrier to commerce between "the Bethlehems". As a result of the consolidation of the two municipalities into a single city, sufficient resources became available to design and construct a new bridge connecting Fountain Hill and Seminary Hill.

By 1921, a commission was in place to design and oversee the construction of the new Lehigh River span. Commission members were the city's first mayor, Archibald Johnston (chairman), J.S. Krause (vice-chairman), G.H. Blakeley, O.L. Henninger (representing Lehigh County), A.A. Woodring (representing Northampton County), A. Geo. Shoffner (secretary), Dallett H. Wilson (counsel) and C.W. Hudson (engineer).

Construction on the Hill to Hill Bridge began on August 1, 1921, after many previous plans. As constructed, the bridge had nine approaches, eleven abutments, forty-eight piers, and fifty-eight spans. It was considered an engineering marvel of its time. By September 1924, the bridge was complete and provided safe, grade-separated connections between the two halves of the city.

Modernization

The structure of the Hill to Hill Bridge was modified significantly during the years after World War II. The first significant change to traffic on the bridge came during the construction of the expressway portion of Route 378 north of the bridge, known locally as the "Spur Route". Initially, the Second Avenue ramp on the north side was closed in 1967. In 1968, the expressway portion was opened.

Three other ramps were removed as part of safety, structural, and redevelopment efforts. On the north side, The South Main Street ramp leading to Lehigh Street and the industrial area along the Monocacy Creek was removed in 1965. The River Street ramp leading to Sand Island was removed in 1988. On the south side, the Second Street ramp was removed in 1989.

The Hill to Hill Bridge today

The bridge saw extensive repairs in 1990, and was painted in spring of 2009. The painting process had caused two of the four traffic lanes to be closed, and had resulted in major traffic congestion. The painting project was finished in time for the opening of the Sands Casino Resort Bethlehem.

Bridge structure

The bridge is noted for its many ramps and branches. It was designed by Clarence W. Hudson and its structure makes use of "a combination of steel through truss and concrete closed spandrel deck arch spans"

1924 (original) ramps and overcrossings from south to north

  • Wyandotte Street entrance
  • Third Street ramp
  • Lehigh (now Brighton) Street ramp
  • Second Street ramp
  • (crossing of Lehigh Valley Railroad tracks)
  • (crossing of Lehigh River)
  • River Street ramp
  • (crossing of Lehigh Coal and Navigation Canal)
  • (crossing of Central Railroad of New Jersey tracks)
  • (crossing of Lehigh Avenue)
  • (crossing of Lehigh and New England Railroad)
  • (crossing of Vineyard Street)
  • (crossing of Spring Street)
  • South Main Street ramp
  • West Side ramp
  • Main Street Branch
  • (crossing of Main Street)
  • Current ramps and overcrossings from south to north

  • Wyandotte Street entrance
  • Second Street ramp
  • Brighton Street ramp
  • (crossing of Norfolk Southern Railroad)
  • (crossing of Lehigh River)
  • (crossing of Norfolk Southern Railroad tracks)
  • (crossing of West Lehigh Street)
  • (crossing of Spring Street)
  • Main Street/Bridge Street ramp
  • Pennsylvania Route 378 ("Spur Route") entrance
  • References

    Hill to Hill Bridge Wikipedia