Status Operational Opened 2017 Track length 166 km (103 mi) Owner Indian Railways | Locale Karnataka Operator(s) South Western Railway Number of tracks 1 | |
Terminis Hassan district, Bengaluru |
Hassan-Bengaluru section belongs to Bangalore division of South Western Railway Zone.
Contents
History
The rail line from Hassan to Bangalore via Shravanabelagola, Kunigal, Nelamangala was announced in Rail budget 1996. Later the work was started in the year 1998.
Inaugural
A goods trial run was completed by 7 January 2006. The line was opened to traffic by 31 January 2006. Special trains were introduced on this line during Mahamastakabhisheka festival in 2006.
References
Hassan-Shravanabelagola section Wikipedia(Text) CC BY-SA