Trisha Shetty (Editor)

Hålogaland Bridge

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Clearance below
  
40 m

Bridge type
  
Suspension bridge

Longest span
  
1,145 m

Hålogaland Bridge httpsuploadwikimediaorgwikipediacommonsthu

Similar
  
Rombak Bridge, Hardanger Bridge, Skjomen Bridge, Narvikfjellet, Tjeldsund Bridge

The Hålogaland Bridge (Norwegian: Hålogalandsbrua) is a suspension bridge under construction which will cross the Rombaksfjorden in the municipality of Narvik in Nordland county, Norway. It will be part of the European Route E6 highway and it will shorten the driving distance from Narvik to Bjerkvik by 17 kilometers (11 mi) and from Narvik to Bjørnfjell, via European Route E10 by 5 kilometers (3.1 mi). The bridge is estimated to cost 2.2 billion kr. Financing will come from a mix of state grants and tolls.

Contents

Map of H%C3%A5logalandbrua, 8517 Narvik, Norway

History

The bridge was originally planned to be either a suspension bridge or a symphony bridge (a combination of a suspension bridge, a cable-stayed bridge and a cantilever bridge) but the latter was dropped in 2008, as it would cost 520 million kr more. The Norwegian Public Roads Administration estimated the cost of a suspension bridge in 2008 to 1,860 million kr. In addition to the bridge, there are also the cost of a tunnel between Trældal and Leirvika, which is estimated at 85 million kr. The administration is also working on a method which would shorten the main span from 1,345 to 1,120 meters (4,413 to 3,675 ft), by placing the pylons in the fjord.

As part of the presumption for building the bridge, Narvik Airport, Framnes would be closed. The bridge would shorten travel time to Harstad/Narvik Airport, Evenes from 60 to 40 minutes, and local politicians have accepted the deal. The Ofoten Regional Council has estimated the saving to 840 million kr over the course of 30 years, should the airport be closed. In October 2009, State Secretary Erik Lahnstein stated that he was not happy with the calculations, as they were based on unrealistic presumptions. In September 2010, Minister of Transport and Communications Magnhild Meltveit Kleppa stated that the state would issue a grant of "several hundred million kroner". On 25 May 2012, Kleppa announced that the government would grant NOK 1.6 billion for the bridge, which would supplement NOK 850 million in tolls and a minor amount from Narvik Municipality. A toll station with a NOK 43 toll was opened in september 2015 along the old road. A new toll station will be opened on the north access road when the bridge opens.

The construction start was 18. February 2013. Expected opening is autumn 2017.

References

Hålogaland Bridge Wikipedia