Supriya Ghosh (Editor)

Goldisthal Pumped Storage Station

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Country
  
Germany

Status
  
Operational

Phone
  
+49 36781 37124

Construction began
  
1997

Location
  
Goldisthal

Commission date
  
2003/2004

Owner
  
Vattenfall

Goldisthal Pumped Storage Station

Upper res. capacity
  
12,000,000 m (9,729 acre·ft) (active)

Lower res. capacity
  
18,900,000 m (15,322 acre·ft)

Address
  
Hauptstraße 18, 98746 Goldisthal, Germany

Similar
  
Markersbach Pumped Storage P, Leibis‑Lichte Dam, Thuringian Highland, Haus der Natur Goldisthal, Saalfeld Fairy Grottoes

The Goldisthal Pumped Storage Station is a pumped-storage power station in the Thüringer Mountains at the upper run of the river Schwarza in Goldisthal, Germany. It was constructed between 1997 and 2004. It has an installed capacity of 1,060 megawatts (1,420,000 hp), the largest hydroelectric power plant in Germany and one of largest in Europe.

Contents

Facility

The upper reservoir is located at an altitude of 880 m (2,887 ft). It has an active (or usable) capacity of 12 millions m³ and a surface area of 55 hectares. In order to create this basin, the mountain summit was cleared away. This stored quantity of water is enough for eight hours of operation. This corresponds to a maximally storable electric power quantity of 8.5 GWh with the existing height difference between storage basins and turbines. Two 800 m long penstocks, inclined at approximately 25 degrees serve as a conduit for water transfer. The lower reservoir has a capacity of 18.9 million cubic metres (670×10^6 cu ft). The power station contains four 265 MW Francis pump turbines.

Construction

From the outset of planning of this power station, it met with opposition and was contested with broad resistance from environmental protection groups, in particular from the Green League. The project was first discussed in 1965 and in 1975 geological investigations were carried out. Planning was halted in 1980–1981 due to funding issues but was then resumed in 1988. Construction eventually began in 1997 and the first generators were commissioned in 2003. It was officially opened on 30 September 2003. In 2004, all four generators were commissioned. The construction costs amounted to 600 million euros.