Girish Mahajan (Editor)

German submarine U 993

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Name
  
U-993

Yard number
  
669

Commissioned
  
19 August 1943

Launched
  
8 July 1943

Draft
  
4.74 m

Builder
  
Blohm + Voss

Ordered
  
25 May 1941

Laid down
  
16 November 1942

Construction started
  
16 November 1942

Length
  
67 m

Beam
  
6.2 m

German submarine U-993

Fate
  
Sunk by British Air Raid on 4 October 1944

German submarine U-991 was a Type VIIC U-boat of Nazi Germany's Kriegsmarine during World War II.

Contents

Construction

The U-991 was laid down on 16 November 1942 at the Blohm & Voss yard in Hamburg, Germany. She was launched on 8 July 1943 and commissioned on 19 August 1943 under the command of Oberleutnant zur See Kurt Hilbig, who was replaced on 17 August 1944 by Oberleutnant zur See Karl-Heinz Steinmetz. Her U-boat emblem was 13 and Clover.

When she was completed, the submarine was 67.10 metres (220 ft 2 in) long, with a beam of 6.18 metres (20 ft 3 in), a height of 9.60 metres (31 ft 6 in) and a draft of 4.74 metres (15 ft 7 in). She was assessed at 864.7 t (851 long tons) submerged. The submarine was powered by two Germaniawerft F46 four-stroke, six-cylinder supercharged diesel engines producing a total of 2,800 to 3,200 metric horsepower (2,060 to 2,350 kW; 2,760 to 3,160 shp) for use while surfaced and two BBC GG UB 720/8 double-acting electric motors producing a total of 750 metric horsepower (550 kW; 740 shp) for use while submerged. She had two shafts and two 1.23 m (4 ft) propellers. The submarine was capable of operating at depths of up to 230 metres (750 ft), had a maximum surface speed of 17.6 knots (32.6 km/h; 20.3 mph) and a maximum submerged speed of 7.5 knots (13.9 km/h; 8.6 mph).When submerged, the U-boat could operate for 80 nautical miles (150 km; 92 mi) at 4 knots (7.4 km/h; 4.6 mph) and when surfaced, she could travel 8,500 nautical miles (15,700 km; 9,800 mi) at 10 knots (19 km/h; 12 mph).

The submarine was fitted with five 53.3 cm (21 in) torpedo tubes (four fitted at the bow and one at the stern), fourteen torpedoes, one 8.8 cm (3.46 in) deck gun (220 rounds) and an 3.7 cm (1.46 in) anti-aircraft gun. The boat had a complement of 44 to 57 men.

Service history

U-991 was used as a Training ship in the 5th U-boat Flotilla from 19 August 1943 to 29 February 1944 where she had been trained and tested at the individual commands (UAK, TEK, AGRU-Front, etc.) and had been part of Ausbildungsflottillen (26th U-boat Flotilla, 27 U-flotilla, etc.) for remaining works and equipment, before serving in the 3rd U-boat Flotilla for active service on 1 March 1944.

Patrols And Incidents

During her active service, U-993 made 3 patrols. She left Marviken on 23 March 1944 for her first patrol and patrolled the North Atlantic between Ireland and Newfoundland. On 17 April 1944 at 3.51am, North West of Cape Finisterre, U-993 was attacked by a British B-24 Liberator BZ945 (53 Sqdn RAF/O, pilot F/L L.M. Burton). The B-24 strafed the boat in a Leigh Light attack and dropped two depth charges and a small bomb on the submarine, which fell wide causing no damage. The plane however wasn't so lucky as it was hit by flak during the approach, which set one of the port engines on fire. The plane crashed in the sea and exploded on impact approx. 600m (656 yds) from the submarine, all 11 aircrew were killed in the crash. The U-993 arrived in Lorient on 22 April 1944 without further incident, after a patrol of 31 days.

U-993 left Lorient for her second patrol on 6 June 1944 and patrolled the Atlantic Ocean, but she stayed close to the French coast. She arrived in Brest on 14 June 1944 after a patrol of 9 days.

The submarine left Brest for her third and last patrol on 17 August 1944 under the command of a new commander, Oberleutnant zur See Karl-Heinz Steinmetz. The submarine was also fitted with a Schnorchel underwater-breathing apparatus in August 1944. She patrolled the North Atlantic and sailed West off the coast of Ireland and North of the Faroe Islands. On 12 September 1944, a crew member died of jaundice in the North Atlantic. The submarine arrived Bergen on 18 September 1944 after a patrol of 33 days. In total, U993 spend 76 days at sea.

Sinking

On 4 October 1944, U-993 was stationed in the Laksevaag shipyard at Bergen, Norway. At 9.30am, 47 Lancaster Bomber and 93 Halifax bomber of 6 RCAF and 8 RAF Group threw a total of 603 bombs which each weight 1000 pounds on the port of Bergen. Seven bombs hit the submarine bunker, but focused on the thick reinforced concrete slabs resulted in almost no damage. Only the electrical wiring was destroyed and the repair yards were severely damaged.

However, U-993 and U-228 both capsized and sank in a floating dock outside the bunker and U-92 and U-437 were so badly damaged that they had to be decommissioned. Twenty of the Allied machinery had received specific objective instructions for damaging and/or destroying unprotected submarines in the port. One man died on U-993 and another man died the following day of his injuries, the survivor count is unknown. The submarine was later salvaged and decommissioned. After the war in May 1945, the submarine was captured by British forces and broken up.

References

German submarine U-993 Wikipedia