Rahul Sharma (Editor)

Gdańsk Brzeźno railway station

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Location
  
Gdańsk Poland

Line(s)
  
No passenger service

Opened
  
1867

Operated by
  
SKM (Tricity)

Platforms
  
1

Closed
  
2005

Gdańsk Brzeźno railway station

Gdańsk Brzeźno is a former SKM stop in Gdańsk, Poland. It is no longer used since June 2005, after canceling passenger service on Gdańsk - Nowy Port line. This line is now used only for freight transport.

There is plan to include the stop in the planned new Metropolitan Tricity Train line to be ready for 2012 UEFA European Football Championship.

The line

The line connecting Gdańsk Główny (Danzig Hbf.) with Gdańsk Nowy Port (Danzig Neufahrwasser) was opened in October 1867. It had been electrified in 1951, but the voltage was changed (from 800 volts) into standard 3 kV in 1973. The line served mostly as the transport route for shipyard workers who commuted to the Gdańsk Shipyard. On December 15, 2002 the line was shortened to reach only Gdańsk Brzeźno. On June 25, 2005 the line was completely closed for passenger service.

References

Gdańsk Brzeźno railway station Wikipedia