State Road 836 (SR 836), locally known as the Dolphin Expressway or the Dolphin Tollway, is a 15 miles (24 km)-long six-lane divided expressway, with the westernmost 14 miles (23 km) being an all electronic tollway, and the easternmost 1.292 miles (2.079 km) of SR 836 between I-95 and SR A1A is signed Interstate 395. The road currently extends from just north of the intersection of Southwest 137th Avenue and U.S. Route 41 (SR 90) in Tamiami, eastward past the Homestead Extension of Florida's Turnpike (SR 821) and Miami International Airport, before intersecting I-95, becoming I-395 and ending at SR A1A in Miami at the west end of the MacArthur Causeway. The Dolphin Expressway is maintained and operated by the Miami-Dade Expressway Authority, while the I-395 section is maintained by FDOT. The Dolphin Expressway from the Palmetto Expressway to I-95 opened in 1969, with the I-395 section opening in 1971, the extension to the HEFT opening in 1974 and a second western extension opening in 2007.

Contents

Map of FL-836, Miami, FL, USA

Route description

The highway begins just north of the intersection of Southwest 137th Avenue (unsigned SR 825) and U.S. Route 41 (SR 90) in Tamiami, built in 2007 and initially accessible only to motorists with SunPass transponders, passing through the first toll barrier. The expressway heads east towards the Homestead Extension of the Turnpike, and then passes through the second of four toll barriers. It then intersects with the Palmetto Expressway (SR 826) at the recently-rebuilt Dolphin-Palmetto Interchange, and passes through the southern end of the Miami International Airport. With the failure of the Florida Department of Transportation to build either the previously planned airport spur or the proposed LeJeune Road Expressway to give additional access to the airport, Miami-Dade County's sole complete east–west throughway is now often congested, most commonly in the stretch between the Palmetto Expressway (SR 826) and LeJeune Road (SR 953). During this stretch, the expressway have interchanges with NW 72nd Avenue, a third toll barrier, NW 57th Avenue, and a partial with NW 45th Avenue before reaching LeJeune Road. East of the interchange with the airport at LeJeune Road, The expressway has interchanges with NW 37th Avenue and NW 27th Avenue (SR 9), and then reaches the fourth and final toll barrier just west of downtown. The highway has two more interchanges in the fringes of downtown with NW 17th Avenue and NW 12th Avenue before intersecting with I-95 at the Midtown Interchange and becoming a free road and unsigned as Interstate 395 goes into downtown Miami.

I-395 heads east as an elevated, six-lane expressway into downtown Miami. The feeder lanes from I-95 to eastbound I-395 make up a separate three lane ramp to the right of I-395, with the exit to US 1/US 41 being a left exit from the I-395 lanes and a right exit from the I-95 feeder lanes. The feeder lanes then merge into three lanes, heading east towards the MacArthur Causeway, with I-395 and SR 836 terminating just east of an entrance ramp with US 1 (SR 5)/US 41, and continuing as SR A1A.

Tolls

The Dolphin Expressway is an all-electronic toll road that only accepts tolls via SunPass transponders or billing by the toll-by-plate at double cost. The toll road does not accept cash. Toll gantries are located along the expressway and on interchange ramps, eliminating all "free movement" sections that existed in the past. As of November 15, 2014, the total toll for traffic traveling along the expressway from Northwest 137th Avenue to Interstate 95 is $2.40 for SunPass users, and $4.80 for Toll-by-Plate users.

History

Originally envisioned as the Twentieth Street Tollway in 1964 (with a spur to the airport along LeJeune Road), construction on the Fourteenth Street east–west Expressway between the Palmetto Expressway and US 1 started in 1967 and was completed in 1969. Two years later, construction of the western extension to Florida's Turnpike commenced, and was finished in 1974. Also in 1974, the name of the tollway was changed to commemorate the success of the Miami Dolphins of the NFL, after back-to-back wins in the Super Bowl.

The section of SR 836 signed as I-395 was supposed to open with the rest of the Dolphin Expressway in 1968, but was delayed due to a freeze at the federal level for road spending. The expressway opened on March 26, 1971.

Initial plans for the Interstate 75 extension to Miami in 1968 would have had used the Dolphin Expressway as its final link to Interstate 95 (I-75 would have crossed the Everglades via the Tamiami Trail under this plan). However, these plans were abandoned in 1973 in favor of I-75's current route farther north. The fact that the Dolphin Expressway was not built to interstate standards was one of the factors in changing I-75's proposed route.

Construction of a second westward extension of SR 836 started in 2004. This extension, westward to Northwest 137th Avenue near Northwest 12th Street, opened June 22, 2007, was initially accessible only to motorists with SunPass electronic toll-paying capability; there is no capacity for the collection of cash. The road has since opened to non SunPass users with the Toll by Plate system.

Until July 1, 2007, the toll for eastbound automobiles was $1.25 ($1.00 for motorists with SunPass), paid at a toll booth between Northwest 22nd and Northwest 17th Avenues (toll is not collected from westbound traffic). In conjunction with the completion of the new three-mile-long extension west of the Turnpike, tolls of $1.00 (75 cents for motorists with SunPass) were collected from traffic in both directions west of SR 973 (Northwest 87th Avenue/Galloway Road). Although the new toll was originally stated to be only for the extension, motorists going to the Florida Turnpike or Northwest 107th Avenue also have to pay.

On July 21, 2013, the eastbound toll plaza near I-95 ceased cash collection and became all electronic, with those paying with SunPass paying $1, and Toll by Plate users paying $2.

On November 15, 2014, the Dolphin Expressway became an all electronic toll road, no longer collecting cash, and the only ways to pay are either by the SunPass transponders or billing by the toll-by-plate program, at double the cost of SunPass users. Toll gantries are located along the expressway and on interchanges to where there are no "free movement" sections of the expressway as existed previously. The move was first announced in 2010, and along with the nearby Airport Expressway, was the last of the MDX expressways to be converted to open road tolling.

On May 24, 2010, construction began on the Port Miami Tunnel, a $1 billion project that connects the port to other major highway arteries, including I-395, with the tunnel opening on August 3, 2014.

Future

Short range plans include the construction of additional lanes to match the rebuilt, higher capacity Dolphin-Palmetto Interchange, with SR 826. A planned third extension (southward to Southwest 136th Street) is currently being considered, though may have been replaced with the widening of the rural surface road Krome Avenue to four lanes. The Dolphin Expressway will be home to two of the state's three diverging-diamond interchanges after the reconstruction of two exits at Northwest 27th Avenue and Northwest 57th Avenue. The third diverging-diamond interchange is not in South Florida.