Neha Patil (Editor)

Fakiragram Junction railway station

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Elevation
  
43 metres (141 ft)

Structure type
  
Standard on ground

Owner
  
Indian Railways

Owned by
  
Indian Railways

Address
  
Fakiragram, Assam 783345

Platforms in use
  
5

Fakiragram Junction railway station

Location
  
Fakiragram, Kokrajhar, Assam India

Operated by
  
Northeast Frontier Railway

Line(s)
  
New Jalpaiguri-New Bongaigaon section of Barauni-Guwahati line Fakiragram-Golokganj-Dhubri branch line

Similar
  
New Bongaigaon Junction r, Jalpaiguri Road railway st, Rangiya Junction railway st, Nalbari railway station, Furkating Junction railway st

Fakiragram is a railway station on the New Jalpaiguri-New Bongaigaon section of Barauni-Guwahati line and is located in Kokrajhar district in the Indian state of Assam. A branch line from Fakiragram connects to Dhubri.

Contents

History

Fakiragram railway station came up with the construction of the Golokganj-Amingaon railway line by Assam-Behar State Railway in the 1900–1910 period. During the period Assam was connected to the rest of India entirely through eastern Bengal.

In pre-independence days, there was a metre gauge line Katihar-Radhikapur- Biral-Parbatipur-Tista-Gitaldaha-Golokganj–Fakiragram.

With the partition of India in 1947, the railway link to Assam through East Bengal was broken and Assam got delinked from the rest of India. Indian Railways took up the Assam Link Project in 1948 to build a rail link between Fakiragram and Kishanganj. Fakiragram was connected to the Indian railway system in 1950.

Construction of the 265 km (165 mi) long 1,676 mm (5 ft 6 in) wide broad gauge Siliguri-Jogihopa line, between 1963 and 1965, brought broad gauge railways to Assam.

Fakiragram-Dhubri line was opened in September 2010 after conversion to broad gauge.

Electrification

Electrification of the Barauni-Katihar-Guwahati line was sanctioned in 2008. In the document on Vision 2020 – A Blue Print for Railway Electrification Programme, in the list of ongoing projects the entire route km (836) is shown as balance work as on 1 April 2010. The entire electrification project is scheduled to be completed by October, 2015.

Amenities

Fakiragram railway station has one double-bedded retiring room.

References

Fakiragram Junction railway station Wikipedia