Girish Mahajan (Editor)

Edmonton Incinerator

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Official name
  
London EcoPark

Location
  
Greater London

Primary fuel
  
Waste

Country
  
England

Commission date
  
1971

Operator
  
LondonWaste Ltd

Edmonton Incinerator httpsuploadwikimediaorgwikipediacommonsthu

I4edical waste aids edmonton incinerator


Edmonton Incinerator (officially London EcoPark) is a municipal waste incinerator and waste-to-energy power station which burns London's waste to provide electricity for the National Grid. It is located on the River Lee Navigation and bordered by the North Circular Road, in Edmonton in the London Borough of Enfield.

Contents

History

The incinerator was commissioned (began operations) in 1971, by the Greater London Council. The building is of metal sheet clad construction with a 100 metres (330 ft) reinforced concrete chimney. It was described by Nikolaus Pevsner as being, "on the edge of the marshes, in a setting that enhances its impressive scale. Vast box-like forms clad in corrugated metal sheeting, pale grey and dark grey, approached by two big ramps on tapering piers. Huge cylindrical concrete chimney containing two flues". The incinerator is currently Britain's largest and it handles unrecycled waste from seven London Boroughs: Barnet, Camden, Enfield, Islington, Hackney, Haringey, and Waltham Forest. The waste is converted into electricity, bottom ash, air pollution control residue, and flue gases. 55 megawatts (MW) of electricity are generated, sufficient power to meet the needs of 24,000 households.

In early 2002, plans were rejected for a large expansion of the incinerator, which would have made it the largest household waste incinerator in Europe. Permissions had been granted by both the Environment Agency and Enfield Council, but on 23 May 2002, Energy Minister Brian Wilson refused the plans on the basis of the 2000 Waste Strategy.

Environmental impact and protests

The site has been the scene of a demonstration by Greenpeace, who are against all incinerators because of concerns that they emit "a cocktail of chemicals that can cause cancers and asthma attacks", and that incineration "undermines targets for waste reduction and recycling". In October 2000 they scaled and occupied the station's chimney, shutting its operations down for four days. The incinerator has also been campaigned against by Friends of the Earth and Londoners Against Incineration.

An Environment Agency report on the safety of incinerator ash was published in May 2002. It highlighted that up until 2000, ash from Edmonton had been used in the manufacture of construction blocks, which was hazardous because of the raised levels of dioxins in dust from the blocks. However, the practice ceased in August 2000.

In 2007, there were concerns that a rise in infant deaths in the area was caused by fumes from the incinerator.

Today

The site is now known as the LondonWaste EcoPark and is run by LondonWaste. Trials are being carried out to use the River Lee Navigation in transporting materials to the incinerator. A large composting facility opened on the site in 2006, allowing green and kitchen waste from local homes to be converted into compost.

References

Edmonton Incinerator Wikipedia