Existed: 2006 – present Length 18 km | History: Completed in 2009 Constructed 2006 | |
![]() | ||
From: Jalan Duta Interchange on North-South Expressway Northern Route Primarydestinations: Jalan Duta, Segambut, Sentul, Setiawangsa, Ulu Klang |
Duta–Ulu Klang Expressway (DUKE), E33, is the main expressway network in Klang Valley, Malaysia. The 18 km (11 mi) expressway connects New Klang Valley Expressway's Jalan Duta Interchange E1 to Taman Hillview Interchange on Kuala Lumpur Middle Ring Road 2 28 in Ulu Klang. The expressway was constructed to provide the "missing link" between New Klang Valley Expressway E1, Kuala Lumpur-Karak Expressway 2, E8, and Kuala Lumpur Middle Ring Road 2 28. This expressway is also known as the Kuala Lumpur Northeast Dispersal Link Scheme. It was proposed by Tan Sri Datuk Lim Kang Hoo, a chairman of Ekovest Berhad.
Contents
- Map of DUKE Kuala Lumpur Malaysia
- Duta Sentul Pasar Ulu Klang sections
- Greenwood Sentul Pasar sections
- History
- Progress
- DUKE Extension Expressway Project
- Features
- Tolls
- Toll rates
- References
Map of DUKE, Kuala Lumpur, Malaysia
In addition to improving connectivity, DUKE disperses traffic from the city to the suburban range through several routes in and out of several branches of the main intersection. Through DUKE, it can move from one part to other parts of Kuala Lumpur in a short time, by bypassing congested traffic areas, such as Kuala Lumpur Middle Ring Road 1 and Kuala Lumpur Inner Ring Road.
Duta-Sentul Pasar-Ulu Klang sections
The Kilometre Zero of this section is located at Jalan Duta Interchange near Jalan Duta, Kuala Lumpur, at its interchange with the New Klang Valley Expressway .
Greenwood-Sentul Pasar sections
The Kilometre Zero of this section is located at Sentul Pasar Interchange. At Bandar Dalam Interchange the expressway overlaps with the Federal Route 2 from Bandar Dalam Interchange to Greenwood Interchange.
History
The expressway used to be known as the Kuala Lumpur North East Expressway (KLNEE). It is a main element in the Kuala Lumpur Structure Plan 2020 as specified in the Transportation Research of the Japan International Cooperation Agency (JICA) conducted by the Kuala Lumpur City Hall (Dewan Bandaraya Kuala Lumpur) (DBKL) in 1985. It was identified by DBKL as one of the main connecting routes to complete the Kuala Lumpur Structure Plan 2020. DBKL conducted a detailed study of the alignment that feed the next three years, including Environmental Impact Assessment and Public Opinion. These studies and reports were approved by the Concession Agreement signed with the Federal Government on 12 August 2004.
The construction of this expressway commenced in mid-2006. The Jalan Duta-DUKE Interchange was built at the sharp hairpin of the NKVE and the Jalan Kuching Interchange was built at the former Jalan Kuching Toll Plaza owned by Kamunting Corporation Berhad. The expressway was partially (2/3) was officially opened by the Minister of Works Ir Mohd Zin Mohamed on 9 January 2009. Three months later, the NKVE section was open to traffic on 30 April 2009. Built to accommodate 120,000 vehicles per day, this expressway will offer an attractive alternative route to Klang Valley residents, especially for those traveling from east to west and for those who want to go to the city centre.
Progress
Construction progress gallery
DUKE Extension Expressway Project
The phase two development of the DUKE will be built by Ekovest Bhd and will start in two weeks at a construction cost of RM1.183 billion. Phase two, which will entail the construction of an elevated highway that will complement the existing DUKE, was to be completed in 2015. The DUKE extension will comprise two additional links, namely the Sri Damansara Link and the Tun Razak Link. Both links are proposed to have dual carriageways and the Tun Razak link will be about 9 kilometres in length while the Sri Damansara Link will be 7 kilometres long. The expressway will serve as a link between the Kuala Lumpur Middle Ring Road 1 (MRR1) and Kuala Lumpur Middle Ring Road 2 MRR2.
Features
Tolls
The DUKE uses an open toll system.
Batu, Sentul Pasar and Ayer Panas toll plazas have fully Electronic Toll Collections (ETC). As part of an initiative to facilitate faster transaction at the Batu, Sentul Pasar and Ayer Panas Toll Plazas, all toll transactions at three toll plazas on the DUKE are conducted electronically via Touch 'n Go cards or SmartTAGs starting 9 September 2015.
Toll rates
(Starting 15 October 2015)
Note: Toll charges can only be paid with the Touch 'n Go cards or SmartTAG. Cash payment is not accepted.