Dogger Bank Wind Farm is a proposed offshore wind farm to be located between 77 to 180 miles off the east coast of Yorkshire, in the North Sea, England. It is being developed by the Forewind consortium. It is expected that the Dogger Bank development will consist of four offshore wind farms, each with a capacity of up to 1.2 GW, creating a combined capacity of 4.8 GW. Further plans for an additional two 1.2 GW wind farms were shelved in 2015. Planning consent for the first phase of the project (Dogger Bank Creyke Beck) was granted by the UK government in February 2015, and consent for the second phase (Dogger Bank Teesside) was granted in August 2015.

Contents

Dogger Bank Wind Farm Royal HaskoningDHV key in consent UK wind farms

Project overview

Dogger Bank Wind Farm Dogger Bank wind farm zone

Dogger Bank is in the North Sea, located between 125 kilometres (78 mi) and 290 kilometres (180 mi) off the east coast of Yorkshire. It is one of nine offshore zones belonging to the Crown Estate which formed part of the third licence round for UK offshore wind farms.

Dogger Bank Wind Farm Forewind Dogger Bank Creyke Beck

The Forewind consortium was formed by the four owner companies – SSE, RWE, Statoil and Statkraft – in November 2008 in response to the third licence round. In January 2010, Forewind was announced as the developer for the Dogger Bank Zone, the largest of the Round 3 zones. Statoil increases its share from Statkraft, beginning in 2017.

Dogger Bank Wind Farm staticguimcouksysimagesGuardianAboutGenera

Originally projected to produce up to 9 gigawatts of power, the plan was scaled down to 7.2 gigawatts in 2014, and scaled down even further to 4.8 gigawatts in 2015.

Dogger Bank Creyke Beck

Dogger Bank Wind Farm OMM Completes Data Study for Dogger Bank Wind Farm Development UK

The first phase will be for Dogger Bank Creyke Beck A and B. This will comprise two offshore wind farms each generating up to 1.2GW of electricity, with a total installed capacity of up to 2.4GW. They would connect to the existing Creyke Beck substation near Cottingham, in the East Riding of Yorkshire. The two sites lie 131 kilometres (81 mi) from the East Yorkshire coast. Dogger Bank Creyke Beck A will cover an area of 515 square kilometres (199 sq mi), and Dogger Bank Creyke Beck B will cover an area of 599 square kilometres (231 sq mi). Planning consent was granted for 400 turbines on 17 February 2015.

Dogger Bank Teesside

Dogger Bank Wind Farm Awarded wind contract for Dogger Bank Statkraft

Dogger Bank Teesside is intended to be the second stage of development of the Dogger Bank Zone. It was divided into two phases of development: Dogger Bank Teesside A & B and Dogger Bank Teesside C & D. These would connect to the National Grid at a substation in Redcar and Cleveland, Teesside.

Dogger Bank Teesside A & B

Dogger Bank Teesside A & B comprises two wind farms, each generating up to 1.2GW of electricity. Dogger Bank Teesside A lies 196 kilometres (122 mi) from the shore and will cover an area of 560 square kilometres (220 sq mi). Dogger Bank Teesside B lies 165 kilometres (103 mi) from the shore and will cover an area of 593 square kilometres (229 sq mi). Planning consent was granted for 400 turbines on 5 August 2015. Construction of the wind farms must begin before August 2022.

Dogger Bank Teesside C & D

This second application (C and D) was planned to comprise two wind farms, each generating up to 1.2GW of electricity. It was originally expected that planning consent would be determined in 2017. However, in August 2015 Forewind scrapped the final phase and returned the remaining area of the Dogger Bank development zone to the Crown Estate.

References

Dogger Bank Wind Farm Wikipedia