DCV Balder

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Name
  
Balder

Completed
  
1978

Weight
  
104,400 tons

Port of registry
  
Length
  
154 m

Displacement
  
104.4 million kg

DCV Balder httpsc1staticflickrcom87019675041573725bf

Namesake
  
Baldr (god in Norse mythology)

Builder
  
Mitsui Engineering & Shipbuildingconversion to a DCV by Verolme Botlek

Dcv balder undocking


DCV Balder is a Deepwater Construction Vessel (DCV) operated by Heerema Marine Contractors.

Contents

On site machining of winch drum dcv balder


History

The Balder was constructed in 1978 as semi-submersible crane vessel by Mitsui Engineering & Shipbuilding Co., Ltd.. Balder and sister vessel, Hermod were the world's first semi-submersible crane vessels. In the early 1980s these vessels set several lift records while operating in the North Sea. Conversion to a DCV was carried out in 2001 by Verolme Botlek BV in the Netherlands.

Design

DCV Balder Balder

The hull consists of two floaters with three columns each. The transit draught of 12 meters is normally ballasted down to 25 meters for lifting operations, with the floaters (with a draught of 12 meters) are well-submerged, reducing the effect of waves and swell.

DCV Balder DCV Balder and quotUnion Mantaquot seen from Flareboom Thunderho Flickr

It is powered by seven 3,500 kW azimuth thrusters and two propellers. There is accommodation for 350 persons. Lightship weight is 49,631 tonnes.

In the 2001 conversion, it was fitted with seven thrusters and a J-lay system. The 98 m J-Lay tower, designed and constructed by Huisman Itrec, is capable of laying pipe in water depths to 3,000 m (10,000 ft). Balder was also equipped with class III Dynamic Positioning system and a Mooring Line Deployment winch. The winch is the largest in the world, with a diameter of 10.5 meters and a Safe Working Load (SWL) of 275 t.

Cranes

DCV Balder DCV Balder Mega Structure Pinterest

The Balder has two cranes (3600 t, 2700 t). Originally the starboard-side crane was rated at 3000 short ton and the port-side at 2000 short ton. In 1984, the lifting capacities were upgraded to 4000 and 3000 short tons respectively in a fixed mode (and 3300 & 2200 in revolving mode). To accommodate the J-Lay tower, the port crane jib was converted to a fly jib in 2001.

Remarkable projects

DCV Balder DCV Balder Wikipedia

  • In 1978 Occidental’s Piper Alpha was the first platform installation with a Semi Submersible Crane Vessel. It was a British platform that blew out and burned to the water, killing 167 of its crew.
  • In 2005 the world's largest semi-submersible platform, BP's Thunder Horse, was installed. Later in the year, Balder assisted in righting Thunder Horse, found listing dramatically after Hurricane Dennis.
  • In 2006 it installed BP’s Mardi Gras Atlantis gas export pipeline (0.6 m / 24 in diameter) in a record breaking water depth of 2220 meters (7217 feet).
  • in 2007 it moored the Independence Hub Facility in a record breaking water depth of 2438 m (8000 ft), with a world record for the deepest flow line installation of 2743 m (9000 ft).