Crnogorski Elektroprenosni Sistem

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Industry
  
Electricity

Founded
  
2009 (2009)

Parent
  
A2A

Predecessor
  
Prenos AD

Headquarters
  
Podgorica, Montenegro

Services
  
Electric power transmission

Crnogorski Elektroprenosni Sistem AD (MNSE: PREN) (CGES; former name Prenos AD; meaning: Montenegrin Electrical Transmission System) is an electric power transmission system operator located in Podgorica, Montenegro. It is a member of European Network of Transmission System Operators for Electricity. AD stands for Akcionersko Drustvo, or Joint Stock Company.

In 2009, the company broke away from EPCG and partly privatized, with 43.7% stake in the company acquired by the Italian utility company A2A. 22% stake is owned by Italian electricity transmission company Terna.

CGES and Terna are planning to build a 450-kilometre (280 mi) 1,000 MW submarine cable between Tivat and Pescara. The cable to be operational by 2015.

The European Bank for Reconstruction and Development is preparing a €65 million syndicated loan for the company. The loan would be used for the construction of a new substation at Lastva, and a new line from Lastva to Pljevlja to be connected to the Italy–Montenegro interconnector.