Supriya Ghosh (Editor)

Cripple Creek and Victor Narrow Gauge Railroad

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Reporting mark
  
None

Phone
  
+1 719-689-2640

Preserved gauge
  
2 ft (610 mm)

Locale
  
Teller County, Colorado

Cripple Creek and Victor Narrow Gauge Railroad

Built by
  
Midland Terminal Railway (MTR) Florence and Cripple Creek Railroad (FCCR)

Original gauge
  
4 ft 8 ⁄2 in (1,435 mm) standard gauge (MTR), 3 ft (914 mm) (FCCR)

Operated by
  
Cripple Creek & Victor Narrow Gauge Railroad

Length
  
4 miles (6.4 km) round trip

Address
  
520 E Carr Ave, Cripple Creek, CO 80813, USA

Similar
  
Mollie Kathleen Gold Mine, Cripple Creek District M, Old Homestead House M, Rocky Mountains, Outlaws & Law Men Jail Muse

A corvair trip cripple creek and victor narrow gauge railroad


The Cripple Creek & Victor Narrow Gauge Railroad (CC&VNG RR) is a 2 ft (610 mm) narrow gauge heritage railroad that operates seasonal tourist trains between Cripple Creek and the city's outskirts to the south. The railroad uses a revitalized section of the original Midland Terminal Railway and the Florence and Cripple Creek Railroad. The railroad's one station and around half of its route is located within the Cripple Creek Historic District, a National Historic Landmark.

Contents

Rolling stock

As of the 2008 season, the railroad operates three coal-fired narrow gauge steam locomotives. Engine #1 is an 0-4-4-0 Orenstein & Koppel articulated mallet built in 1902. Engine #2 is a 0-4-0 Henschel built in 1936. Engine #3 is an 0-4-0 H. K. Porter tank built in 1927. Engine #4 is a W. G. Bagnall 0-4-4-0T, built in 1947. The 5th engine is a 1951 General Electric, four wheel, diesel-electric engine that was battery operated for underground mining at the Idarado Mine near Telluride, Colorado. The engine is currently being used by the railroad's track crew.

Rail gauges

Although the railroads that previously occupied the Cripple Creek & Victor's route were laid to 4 ft 8 12 in (1,435 mm) standard gauge and 3 ft (914 mm) narrow gauge, the current railroad is laid to a 2 ft (610 mm) narrow gauge. The current railroad started operations on June 28, 1967.

Track route

The track system begins at Bennett Avenue/5th Street going south out of Cripple Creek, goes past the old Midland Terminal Wye, then over a reconstructed train trestle, continues past historic mines and terminates very near the abandoned Anaconda mining camp. The return trip to Cripple Creek completes a total of 4 miles (6.4 km). The railroad does not actually terminate at Victor, Colorado, as the railroad's name implies.

Stations and depot

The Bull Hill Station, in Cripple Creek was originally built at the Anaconda Mine in 1894 by the Midland Terminal Railway. However, it was moved to Bull Hill in 1912, east of the town of Victor. In 1968, the depot was moved to Cripple Creek.

References

Cripple Creek and Victor Narrow Gauge Railroad Wikipedia