Samiksha Jaiswal (Editor)

Cowbridge Comprehensive School

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Ages
  
11–18

Date founded
  
1974

Phone
  
+44 1446 772311

Local authority
  
Vale of Glamorgan

Cowbridge Comprehensive School

Established
  
1974 (Original Grammar School 1608 and Girls High School 1896)

Type
  
Co-educational secondary comprehensive

Location
  
Cowbridge Vale of Glamorgan Wales

Website
  
www.cowbridgecomprehensiveschool.co.uk

Address
  
Aberthin Rd, Cowbridge CF71 7EN, UK

Similar
  
Bryn Hafren Compreh, Stanwell School, Y Pant Compreh School, Radyr Compreh School, Bryntirion Compreh School

Cowbridge comprehensive school


Cowbridge Comprehensive School is a secondary school in the town of Cowbridge, Vale of Glamorgan, near Cardiff, Wales.

Contents

The school has approximately 1,300 pupils, 1,000 of whom are in the secondary years and 300 in the sixth-form years studying for Welsh Baccalaureate, AS-Level and A-Levels.

Sid s piano medley cowbridge comprehensive school


Location

The School is in the north-eastern outskirts of Cowbridge, in semi-rural location. Originally, the Sixth Form (Year 12-13) was near the Middle School, based in the former Girls High School building, nearer to the town, and the Lower School (Years 7 and 8) was in the south-west of the town, near the town centre. However, after the redevelopment of the school, all the site's were moved onto the main site which caters for all years, 7 to 13 and ATG.

Performance

In 2008-09, 90.5% of students obtained A* to G grades in 5 or more GCSE exams. 91.6% obtained at least 5 A* to C grades. In the same year, 99.8% of A-Level students obtained an A-E grade and 87.8% obtained A to C, best in Wales

2009 Fire

On 4 December 2009, a fire started in one of the temporary buildings at the lower school at about 08:26 am. About 400 11- to 13-year-olds were evacuated to Cowbridge Leisure Centre, and smoke was visible around Cowbridge as firefighters battled the blaze. The lower school was temporarily shut whilst the building was made safe. No one was in the classroom at the time of the fire.

Redevelopment

The middle school site was under redevelopment since early 2009 in order to bring all sites onto one campus. The development was estimated to have cost £21.5 million. The redevelopment included the complete construction of a new main building and the refurbishment of several existing buildings. In addition to this, a multitude of sports facilities were constructed. Several of these new facilities are now available for bookings out of school hours to the public.

The newly developed site opened up to pupils for the first time in September 2010, and photos of the school are available on the website.

References

Cowbridge Comprehensive School Wikipedia