Kalpana Kalpana (Editor)

Connecticut Central Railroad

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Reporting mark
  
CCCL

Headquarters
  
Middletown, CT

Predecessor
  
Conrail

Dates of operation
  
1987–1998

Length
  
28,807 m

Track gauge
  
4 ft 8 ⁄2 in (1,435 mm) standard gauge

Locale
  
Middlesex County, Connecticut

Successor
  
Providence and Worcester Railroad

The Central Connecticut Railroad was a short-line railroad in the Middletown, Connecticut, area from 1987 to 1998.

Contents

Creation

In 1986, Conrail filed for abandonment of trackage in and around Middletown, Connecticut: the so-called "Middletown Cluster". The Connecticut Department of Environmental Protection purchased the rail facilities in this area for $3.4 million in state bonds; in 1987 it was transferred to the Connecticut Department of Transportation. The Valley Railroad was named the designated operator, and set up the Central Connecticut Railroad as a subsidiary. The railroad was contracted to do the restoration of the tracks, road beds, and highway crossings and to restore rail service on the Wethersfield Secondary between Middletown and Hartford, and between Middletown and Maromas, the northern end of the Valley Railroad's property. The DEP was responsible for contracting the repair of the Middletown Swing Bridge over the Connecticut River to Portland.

Independence

Operations began on March 26, 1987, with transfers arranged with Conrail at Cedar Hill, New Haven. Business was at above projected levels until 1990, when traffic dropped by one third due to the recession, in addition to the closure of a major customer. As a result, the Valley Railroad sold the CCCL to a group of investors. The same year, a sludge-hauling contact with the City of Middletown was signed, and in 1992, a large steel operation began providing business to the railroad. This kept the railroad from falling to bankruptcy.

Buyout

After years of profitable operation, the railroad looked for expansion. The Wethersfield Secondary was only operated as far north as Cromwell, and the railroad looked to extend operations up to the Connecticut Southern Railroad's Hartford Terminal at the north end of the line. The state awarded the rights to the CCCL, and subsequently the Providence and Worcester Railroad bought the company and began their operations in April 1998. This was around the time Conrail was bought and split between CSX Transportation and Norfolk Southern.

Operations

The Central Connecticut Railroad primarily hauled pulpboard, lumber, fertilizer, chemicals, brick, and steel. Many of these customers are still around as customers for the Providence and Worcester.

The following is a list of lines operated, with the customers served:

  • Middletown Secondary, from New Haven to Middletown, 7.3 miles long (Mileposts 15.0 to 22.3)
  • Laurel Industrial Track, from Middletown Center to Maromas, 5.5 miles long (Mileposts 0.0 to 5.5)
  • Portland Industrial Track, from Middletown to Portland, 1 mile long (Mileposts 0.0 to 1.0)
  • East Berlin Industrial Track, in Middletown, 1.2 miles long (Mileposts 0.0 to 1.2)
  • MSR Brick (brick), current customer
  • Primary Steel (steel), current customer
  • Cromwell Industrial Track, Middletown to Cromwell, 2.5 miles long (Mileposts 13.7 to 16.2)
  • Wethersfield Secondary, Cromwell to Hartford
  • References

    Connecticut Central Railroad Wikipedia