Owner City of San Jose Reopened 2012 Capacity 2,850 | Operator Team San Jose Opened 1936 Phone +1 408-792-4111 | |
![]() | ||
Former names San Jose Civic Auditorium (1933–2013) Address 135 W San Carlos St, San Jose, CA 95113, USA Similar Concord Pavilion, San Jose Center For The Perfo, SAP Center, The Independent, San Jose Convention Center |
Nghtmre wobbleland city national civic san jose ca 02 26 2016
The City National Civic (formerly known as the San Jose Civic Auditorium) is a sports arena and concert venue located in downtown San Jose, California. The 2,850-seat venue is owned by the City of San Jose, is managed by Team San Jose and is booked by Nederlander Concerts. The name was changed in December 2013, as part of a development deal with City National Bank.
Contents
- Nghtmre wobbleland city national civic san jose ca 02 26 2016
- Megadeth intro hangar18 city national civic san jose ca 9 29 2016
- References
It was created through a joint venture in 1933 between San Jose residents, Federal Government and local property owners Mr. and Mrs. T.S. Montgomery, who donated to the City of San Jose, the property. The building was designed by Binder & Curtis in the Spanish California Mission style. The Montgomery Theater is attached to the San Jose Civic.
Many of the most popular entertainers and public figures have appeared at the venue creating memorable historic events since its opening in 1936. Barbra Streisand appeared there during her first concert tour in 1963. Richard Nixon made national headlines during an anti-war demonstration at the San Jose Civic.
It has presented major sporting events including boxing matches with champions such as Jack Dempsey and Joe Louis. The Civic hosted the final day of the GENESIS 3 Super Smash Bros. tournament in January 2016.
Under Mayor Chuck Reed and San Jose City Council's leadership, a $13 million renovation of the venue, approved in 2007, is underway. A state-of-the-art sound and video system has been installed, the building's floor has been refurbished, an exterior lighting system has been activated, and the loading dock has been upgraded. Key improvements in process include a top-line interior lighting system, seating upgrades to replace the decades-old plastic molded chairs, more restrooms and a new concessions program.