North end: Dawuan Interchange Length 58.5 km Major cities Purwakarta | Southeast end: Padalarang Interchange Province West Java | |
![]() | ||
Country roads john denver cipularang toll road 2005
The Cipularang Toll Road is a toll road on Java, Indonesia. Opened on 2005, this road connects the Jakarta–Cikampek Toll Road and the Padaleunyi Toll Road. The toll road is operated by PT Jasa Marga Tbk. The names comes from abbreviation of (Ci)kampek - (Pu)rwakarta - Pada (larang). This toll road stretches along the mountains so the track is going up and downhill and many bends and bridges.
Contents
- Country roads john denver cipularang toll road 2005
- Map of Toll Road Cipularang West Java Indonesia
- The cipularang toll road 2009 reggae music
- Lighting
- Road width
- References
Map of Toll Road Cipularang, West Java, Indonesia
The cipularang toll road 2009 reggae music
Lighting
As this toll road runs along hills which don't have access to electricity, PT Jasa Marga Tbk installs a lot of solar street lights to brighten the road in the night. Along KM 104 - 105, lots of solar street lights are installed on the two lanes of the road. Nevertheless, there are also some electric street lights along the toll road, such as around KM 91 and KM 95.
Road width
Generally, each lane of the toll road has only two rows because of the ground contour. But, in some narrow curve in the road, there is an extra row in the left side of each lane which is used by trucks, buses, and containers.