West end: Cikopo IC Length 116 km Major cities Cirebon, Cikopo | East end: Palimanan Province West Java | |
Jalan tol trans jawa trans java toll road jakarta cikopo palimanan kanci brebes
Cikopo–Palimanan Toll Road is a toll road in Indonesia that connects the existing Jakarta–Cikampek Toll Road and Palimanan–Kanci Toll Road and is part of the Trans-Java toll road. The total length of the Trans Java Toll Road is 653 kilometers. The toll road is 40 kilometers shorter than through traditional North Coastal Main Road and predicted will cut 1.5 to 2 hours length of time.
Contents
- Jalan tol trans jawa trans java toll road jakarta cikopo palimanan kanci brebes
- Map of Jl Tol Cikopo Palimanan Jawa Barat Indonesia
- The project
- Opening
- Sections
- Exits
- References
Map of Jl. Tol Cikopo - Palimanan, Jawa Barat, Indonesia
The project
The project is estimated at Rp12.562 trillion ($1.4 billion) and is owned by a Joint venture company PT Lintas Marga Sedaya with portion 55 percent is owned by Plus Expressways Berhad and 45 percent is owned by PT Bhaskara Utama for 35 years concession. In July 2012, 95 percent of land acquisition has been done and bank loan commitment of Rp9 trillion has been got, but the loan only can be withdrawn after 100 percent of land acquisition has been finished. Inline with already finished of all land acquisitions, in September 2012, twenty two banks agreed to initial disburse the fund of the project. At end of January 2014, 15 percent physical project has been finished and predicted the toll road will be operated at end of 2014 or early 2015. On 29 October 2014, PT Lintas Marga Sedaya announced that the toll road would be completed by June 2015.
Opening
On 13 June 2015, Cikopo–Palimanan toll road was opened by Indonesian president, Joko Widodo. Since then, Jakarta and Cirebon are now directly connected by toll road.
Sections
Cikopo–Palimanan Toll Road is 116 kilometers in length and consists of 6 sections: