Total length 520 m Material Concrete | Owner Government No. of spans 13 of 40 m each Width 18 m Bridge type Beam bridge Construction cost 450 million INR | |
Similar Chund Bridge, Malir River Bridge, Sher Shah Bridge, Jhelum Bridge, Kotri Bridge |
Chiniot Bridge (also known as Rabwah Bridge) (Urdu: چنیوٹ پل) is a concrete made bridge located in the Chiniot passing over the Chenab River. It is about 520 meters in length and 17.8 meters wide. It is a two-lane bridge with 26 spans of 40 meters each. It is located at 4.6 km from Khatm-e-Nabuwat Chowk and 3.3 km from Railway Station.
References
Chiniot Bridge Wikipedia(Text) CC BY-SA