Trisha Shetty (Editor)

China Railways CRH1

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
In service
  
2007 - Present

Family name
  
Regina

China Railways CRH1

Manufacturer
  
Bombardier Sifang (Qingdao) Transportation Ltd. (Bombardier Transportation and CSR Sifang)

Number built
  
CRH1A: 186 trainsets (1488 cars) CRH1B: 20 trainsets (320 cars) CRH1E: 20 trainsets (320 cars) CRH380D: 70 trainsets (560 cars) CRH380DL: 0 trainsets (Order converted to 50 D units)

Formation
  
CRH1A: 8 cars per trainset (5M3T) CRH1B/E: 16 cars per trainset (10M6T) CRH380D: 8 cars per trainset (4M4T) CRH380DL: 16 cars per trainset (8M8T)

Capacity
  
CRH1A:668 or 611 or 645 CRH1B:1299 CRH1E:618 or 642 CRH380D: 495 CRH380DL: 1013

The CRH1 EMU is a high-speed train operated by China Railways and built by a joint venture between Bombardier Transportation and Sifang at Bombardier Sifang Power Transportation factory in Qingdao, Shandong Province, People's Republic of China.

Contents

At the same time as ordering the Shinkansen-based CRH2A and the Pendolino-based CRH5A, the Chinese Ministry of Railways ordered Bombardier-based CRH1, specifically 20 CRH1A trainsets in June 2007 and an additional 20 CRH1A trains, each with 8 cars that have total standard capacity of 670 people. The total value of the order is €560 million. In July 2010, a further 40 CRH1A eight-car trains were ordered.

Most CRH1 trains were allocated to Guangshen Railway for replacing all locomotive-hauled trains between Guangzhou and Shenzhen in Guangdong province. Some are also used on the line Shanghai – Nanjing.

CRH1A

CRH1A and CRH1B are based on Bombardier's Regina family. The train was designed by Sifang and Bombardier jointly in Västerås, Sweden and originally named C2008.

Each CRH1A set consists of 8 cars, the first batch (CRH1-001A~CRH1-040A)including 2 first class coaches (ZY), 5 second class coaches (ZE) and 1 second class coach/dining car (ZEC).the second batch (CRH1-081A~CRH1-120A) including 2 first class coaches (ZY), 1 first class/second class coaches (ZYE), 4 second class coaches (ZE) and 1 second class coach/dining car (ZEC). The potential maximum speed of CRH1A is 250 km/h (155 mph), but in fact the maximum speed of the initial 40 sets in operation is always restricted by the software of computer control system, so the maximum speed in service is 220 km/h (137 mph).

The first units (CRH1-001A) were delivered on August 30, 2006, the CRH1A sets started service from February 1, 2007 at the Guangzhou -Shenzhen Railway.

In July 2010, the Chinese MOR ordered additional 40 sets of CRH1A, The designed top operating speed increased to 250 km/h, On September 2010, during test run at Qinshen PDL, top speed of CRH1-081A reach 278 km/h (173 mph).,

In September 2012, The MOR issued a revision in the Zefiro contract, which calls for the order of an additional 106 eight car Zefiro 250 (46 sets) and Zefiro 250NG (60 sets) train sets in lieu of the cancellation of the 16 car Zefiro 380 sets. The NG variant is a new model, which will use new materials in order to achieve weight reductions and more efficient operation.

CRH1B

On October 31, 2007, the Chinese MOR ordered 20 sets of CRH1B trains (CRH1-041B~CRH1-060B). CRH1B is a fleet-extended CRH1A. Each CRH1B consists of 16 cars, including 3 first class coaches (ZY), 12 second class coaches (ZE) and 1 dining car (CA). CRH1B, however, have not such restriction on the operational speed, the maximum speed is still 250 km/h (155 mph).CRH1B first come into commercial use on April, 2009, between Shanghai-Nanjing & Shanghai-Hangzhou.

On July 23, 2011, CRH1-046B was hit on ZY104600 car by CRH2-139E in Yongtaiwen PFL accident.

CRH1E

On October 31, 2007, the Chinese MOR ordered 20 sets of CRH1E trains (CRH1-061E~CRH1-080E).The CRH1E is the first high-speed 16-car sleeper train (10M6T) in the world which is based on Bombardier's ZEFIRO 250 km/h (155 mph) design. The train was designed by Bombardier and Zagato. Each train set consists of 1 luxury sleeper (WG), 12 soft sleepers (WR), 2 second class coaches (ZE) and 1 dining car (CA).the first CRH1E trainset delivered at October 2009,first come into service on November 4, 2009 between Beijing-Shanghai.

CRH380D

The CRH380D is also derived from the Bombardier Zefiro family (Zefiro 380) of very high speed EMUs and are not direct derivatives of the Regina type trains from which the CRH1A and CRH1B classes are derived. Top speed is advertised at 380 km/h (236 mph). The 8-car version is designated CRH380D, series number CRH380D-1501 ~ CRH380D-1570. As of April 4, the first two sets have been delivered, with the first undergoing testing.

Formation

Power Destination

  • M - Motor car
  • T - Trailer car
  • C - Driver cabin
  • P - Pantograph
  • Coach Type

  • ZY - First Class Coach
  • ZE - Second Class Coach
  • ZYE - First Class/Second Class Coach
  • ZEC - Second Class Coach/Dining Car
  • ZYT - First Class/Premier Coach
  • ZET - Second Class/Premier Coach
  • ZYS - First Class/Business Coach
  • ZES - Second Class/Business Coach
  • CA - Buffet Car
  • WR - Soft Sleeper Car
  • WG - Luxury Sleeper Car
  • CRH1A

  • ^1 Train No.CRH1A-1001 to CRH1A-1040, CRH1A-1167, and CRH1A-1168
  • ^2 Train No.CRH1A-1081 to CRH1A-1166
  • ^3 Train No.CRH1A-1001 to CRH1A-1021, CRH1A-1167, and CRH1A-1168
  • ^4 Train No.CRH1A-1022 to CRH1A-1040
  • CRH1B

  • Train No.CRH1B-1041 to CRH1B-1060 and CRH1B-1076 to CRH1B-1080
  • CRH1E

  • ^1 Train No.CRH1E-1061 to CRH1E-1072
  • ^2 Train No.CRH1E-1073 to CRH1E-1075
  • CRH380D

  • ^1 Train No.CRH380D-1501 to CRH380D-1510
  • ^2 Train No.CRH380D-1511 to CRH380D-1570
  • Distribution

    As of March, 2015

    References

    China Railways CRH1 Wikipedia