Puneet Varma (Editor)

Chesterfield railway station

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Place
  
Chesterfield

Station code
  
CHD

DfT category
  
C1

Opened
  
1840

Local authority
  
Chesterfield

Grid reference
  
SK388714

Managed by
  
East Midlands Trains

2011/12
  
1.487 million

Number of platforms
  
3

Chesterfield railway station

Address
  
Chesterfield S41 7UB, United Kingdom

Similar
  
Sheffield station, East Midlands Parkway r, Warrington Central railway st, Widnes railway station, Langley Mill railway station

Chesterfield railway station


Chesterfield railway station serves the town of Chesterfield in Derbyshire, England. It lies on the Midland Main Line. Four tracks pass through the station which has three platforms. It is currently operated by East Midlands Trains.

Contents

The station has the PlusBus scheme where train and bus tickets can be bought together at a saving. In late 2009, Chesterfield became a Penalty fare station for East Midlands Trains services.

Good variety at chesterfield railway station 03 05 2016


History

The first line into Chesterfield was the North Midland Railway from Derby to Leeds in 1840. The original station was built in a Jacobean style similar to the one at Ambergate but it was replaced in 1870 by a new one further south in the current location, when the Midland Railway built the "New Road" to Sheffield. This new station of 1870 was designed by the company architect John Holloway Sanders.

In 1893 the Manchester, Sheffield and Lincolnshire Railway, later to become the Great Central Railway, crossed under the North Midland line 0.5 miles (800 m) south, at Horns Bridge, to a station two hundred yards west of this station. In 1897, the Lancashire, Derbyshire and East Coast Railway arrived, crossing both North Midland and Great Central lines at Horns Bridge with a viaduct seven hundred feet long, leading to a station at West Bars, near the Market Place.

The line into Market Place station closed to passengers in 1951 due to problems in Bolsover Tunnel, the station remained open for goods traffic until March 1957, when it was closed completely. The station building was demolished in 1972. The Great Central station closed in March 1963 and was demolished in 1973 to make way for the town's inner relief road.

The Midland station was demolished and rebuilt in 1963. Most of the buildings from 1963 were demolished in the late 1990s, shortly after privatisation. Most of the buildings on site now date from then.

This station is currently owned by Network Rail but is operated by East Midlands Trains, which operates trains between Sheffield and London St Pancras International, and is part of the Stagecoach Group. The station was extensively rebuilt shortly after Midland Mainline took over its operation from British Rail in 1996. Midland Mainline lost their franchise in November 2007. The running of the station was passed to East Midlands Trains.

Station layout

Entrance to the station is on Crow Lane and includes a car park, taxi rank and bus stop. There is also a small car park on the other side of Crow Lane which does not have a parking charge. The main entrance leads to the station concourse, which was built in the late 1990s. It includes a ticket office, a newsagent, a café and a waiting room. The concourse and the waiting room both have direct access to platform 1. There is also a waiting room on platform 2, which is accessed via a tunnel, using the stairs or lift in the concourse.

Platforms and destinations

The fast lines have two large side platforms, one for each direction. These platforms are covered for around half their length. The goods lines pass around the rear of platform 2, and there is a third large platform here that serves the northbound goods line.

Platform 1 is for northbound trains, calling at stations towards Sheffield, Manchester Piccadilly, Manchester Oxford Road, Liverpool Lime Street, Leeds, York, Doncaster, Newcastle, Edinburgh Waverley and Glasgow Central.

Platform 2 is for southbound trains, calling at stations towards London St Pancras International, Derby, Nottingham, Peterborough, Norwich, Cambridge, Leicester, Birmingham, Bristol, Cardiff Central, Bournemouth, Southampton, Plymouth and Penzance.

Platform 3 is bidirectional and was opened in July 2010. As of May 2015, it is used by some services on the Leeds - Nottingham and Liverpool - Norwich routes at peak periods and during engineering works to reduce dependence on replacement bus services. It is located on the down slow line, backing on to Platform 2, and is long enough to accommodate a 10 car train. Platform 3 had existed in a previous incarnation decades earlier, although it was a bay platform.

The building of platform 3 was originally planned for 2007/8 to go with the East Midlands North Erewash resignalling scheme and would have allowed passenger services to run on the bi-directional down slow line (goods line) from a new Chesterfield South Junction to Tapton Junction during perturbation or engineering work on the fast lines in this area. It would have also facilitated the turn back of trains at Chesterfield during the Bradway Tunnel blockade in 2008/9. Work on the platform actually began in March 2010

Services

The 07:39 East Midlands Trains Master Cutler service runs to London via Derby and Leicester Mondays to Fridays providing a fast business train, arriving at London by 09:37.

Typical weekday service pattern:

  • Northern run an hourly service between Nottingham and Leeds. This service started from the December 2008 timetable change. All Northern Rail trains call at Chesterfield.
  • East Midlands Trains run an hourly service between Liverpool and Norwich and half-hourly service between Sheffield and London, which occasionally extends to Leeds or Scarborough. All northbound trains stop, but of the southbound services to London, one per day does not.
  • CrossCountry operate a half-hourly service from Sheffield to Derby, which continue on to a variety of final destinations; Glasgow, Edinburgh, Plymouth, Reading, Southampton Central and Bristol. Only half of these stop at Chesterfield.
  • Based on the above, there are typically 12 passenger trains per hour passing though the station on weekdays (6 in each direction), with 10 of those calling.

    High Speed 2

    If High Speed 2 is approved it would see a spur south of Chesterfield branch off the Main Route, which will go via the M18, allowing trains to head into Chesterfield (Possible Stop) and also head to Sheffield Midland via the Sheffield to Lincoln Line.

    References

    Chesterfield railway station Wikipedia


    Similar Topics