Puneet Varma (Editor)

Chennai Central metro station

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Platforms
  
Side platforms

Platform
  
Side platform

Structure type
  
Underground

Similar
  
Bharat Insurance Building, Basin Bridge Gas Turbine P, Chromepet Flyover, Chennai Port Trust Centenar, Victoria Public Hall

Chennai Central Metro station is a station on the Line 2 of the Chennai Metro, which is currently under construction. The station is among the underground stations coming up along corridor I of the Chennai Metro, Chennai Airport–Washermanpet stretch. Corridor II will intersect with Corridor I at the station through the line from Egmore. Upon completion, the station will become the largest Metro station in India. Currently, the largest Metro station in India is in New Delhi.

Contents

The station

The station is being constructed as an underground, two-level station on Poonamallee High Road in front of the Chennai Central railway station and the Ripon Building. The station is one of the two metro stations where Corridor I (Airport–Washermanpet) of the project will intersect with Corridor II (Chennai Central–St Thomas Mount via Egmore and CMBT), the other being the Alandur metro station. The metro station, being constructed at a depth of 25 m, will be the largest of all metro stations in the city with an area of over 70,000 sq m. The three-level metro station will cover a length of 410 metres and will have a width of 35 metres. The station will have six entry/exit points for access to Southern Railway, suburban and MRTS stations, Ripon Buildings and Rajiv Gandhi Government General Hospital. The station will act as a transit point for passengers from the Chennai Central, Park Town, and Park railway stations. It is estimated that more than 100,000 commuters will use the station daily.

The station is one of the few in the corridor that will have parking facilities. Space will be allocated for parking in a basement area for about 500 cars and 1,000 two-wheelers. There are also plans to have the airport check-in facility in one of the basement levels at the station, which will allow air passengers to complete the check-in procedures at the station itself. A bus bay has also been planned opposite the station.

The station is one of the three stations in the Chennai Metro Rail network that will have 230-kV receiving sub-stations for power supply from the state's electricity grid. The other two are Koyambedu and Alandur.

The station is expected to be completed by December 2016.

Landscape

The Chennai Corporation has plans to develop a park over the Chennai Central Metro station. Chennai Metro Rail Limited has agreed to a proposal by the Chennai Corporation of extending the Ripon Buildings Park over the Chennai Central underground metro station. Waterproof structures will be created over the station to facilitate the creation of the park. A portion of the park, which will cover more than six acres of the premises of Ripon Buildings and Victoria Public Hall, will be developed on a waterproof concrete slab area, measuring 210 metres by 10 metres. Visitors to the Ripon Buildings Park, Amma Maaligai and Victoria Public Hall will have access to the Central metro station through some of its seven entry points.

References

Chennai Central metro station Wikipedia


Similar Topics