Samiksha Jaiswal (Editor)

Chandni Chowk Flyover

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Type:
  
Flyover

Lanes:
  
3 x 3

Roads at junction:
  
Benazir Bhutto Road Rawal Road

Constructed:
  
by NLC and Habib Construction Services

Opened:
  
11 March 2012 (2012-03-11)

The construction of the Chandni Chowk Flyover was started, at a busy locality of Rawalpindi, on November 3, 2011. Chandni Chowk is considered one of the most central locations of the city of Rawalpindi. On an average, 128,900 vehicles pass through this junction daily which had caused traffic congestion issues. The construction of flyover at the junction confirms a smooth flow of traffic at the Benazir Bhutto Road and particularly at Chandni Chowk. The flyover was completed in 127 days.

The length of the flyover is 403 metres, and it has three lanes each side. On an average, 128,900 vehicles pass through this junction daily and the flyover will help solve the traffic mess on Benazir Bhutto Road, particularly at Chandni Chowk, which had been a great concern for motorists, transporters and commuters.

It opened on 11 March 2012. Chandni chowk is also famous due to food corner situated on its right side while entering from Islamabad

References

Chandni Chowk Flyover Wikipedia