Offshore/onshore offshore Estimated gas in place 2.3×10^ m80×10^ cu ft Discovery 2013 | Block Galata Operator PetroCeltic Start of production 2018 | |
Current production of gas 1.12×10^ m/d40×10^ cu ft/d 0.4×10^ m/a (14×10^ cu ft/a) |
The Chaika gas field natural gas field located on the continental shelf of the Black Sea. It was discovered in 2013 and developed by PetroCeltic. It will begin production in 2018 and will produce natural gas and condensates. The total proven reserves of the Chaika gas field are around 80 billion cubic feet (2.3 km³), and production is slated to be around 40 million cubic feet/day (0,56×106m³) in 2018.
References
Chaika gas field Wikipedia(Text) CC BY-SA