Suvarna Garge (Editor)

Central City Line

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Status
  
Planned

Route type
  
Bus rapid transit

Began service
  
2021 (planned)

Locale
  
Spokane, Washington

Central City Line

System
  
Spokane Transit Authority

Operator
  
Spokane Transit Authority

The Central City Line is a planned 6-mile long bus rapid transit (BRT) line in Spokane, Washington. The line is planned to begin construction in 2019 and open to 2021, and will be operated by the Spokane Transit Authority.

Contents

The line is projected to carry 1 million annual passengers.

Route

The line would begin in the Browne's Addition neighborhood just west of Downtown Spokane, run through the core of downtown, continuing eastward through the University District, and ultimately ending at Spokane Community College in the Chief Garry Park neighborhood.

Stations

All stops and stations will feature level boarding, pre-board ticketing, and real-time information.

Vehicles

The Central City Line will utilize articulated tram-like battery electric buses with inductive charging stations at each terminus.

References

Central City Line Wikipedia