Girish Mahajan (Editor)

Cambrian Line

Updated on
Edit
Like
Comment
Share on FacebookTweet on TwitterShare on LinkedInShare on Reddit
Other name(s)
  
Cambrian Coast Line

Type
  
Heavy rail

Status
  
Operational

Character
  
Rural area

Stations
  
33

Native name
  
Rheilffordd y Cambrian

System
  
National Rail

Owner
  
Network Rail

Operator
  
Arriva Trains Wales

Cambrian Line wwwthecambrianlinecoukuimagescambrianlinemap

Services
  
Shrewsbury–Pwllheli Shrewsbury–Aberystwyth

Termini
  
Shrewsbury railway station

Locale
  
Shropshire, Powys, Ceredigion, Gwynedd

Snowdonian crossing the cambrian line


The Cambrian Line (Welsh: Rheilffordd y Cambrian) is a railway that runs from Shrewsbury (in Shropshire, England) to Aberystwyth (in Ceredigion) and Pwllheli (in Gwynedd), both on the west coast of Wales. The line from Dovey Junction to Pwllheli is sometimes called the Cambrian Coast Line.

Contents

Cambrian Line Cambrian Line east of Cyffordd Dyfi Rudi Winter ccbysa20

The railway is scenic: it runs through the Cambrian Mountains in central Wales and along the coast of Cardigan Bay.

The line includes long sections of rural single track and is designated as a community rail partnership.

Driving a dmu at llanclys on the cambrian line august 2015


Route

Cambrian Line Transport News Publications gt Local Transport Today gt News gt

From Shrewsbury, the line heads west through northern Powys, serving the towns of Welshpool and Newtown. At Dovey Junction, a short distance west of Machynlleth, the line splits into two branches: the southern branch goes to Aberystwyth, and the longer, northern branch continues to Pwllheli via the Cambrian Coast Line, crossing the River Mawddach by Barmouth Bridge.

History

The line is made up of:

Cambrian Line Cambrian Line Wikipedia

  • Shrewsbury and Welshpool Railway between Shrewsbury and Buttington
  • Oswestry and Newtown Railway between Buttington Junction and Newtown
  • Llanidloes and Newtown Railway between Newtown and Moat Lane Junction
  • Newtown and Machynlleth Railway between Moat Lane Junction and Machynlleth
  • Aberystwyth and Welsh Coast Railway between Machynlleth and Aberystwyth/Pwllheli

  • Cambrian Line The Cambrian Trailways Cambrian Lines

    These lines were constructed between 1855 and 1869. From Buttington Junction west became part of the Cambrian Railways in 1864.

    The Cambrian Railways became part of the Great Western Railway. On nationalisation these lines were operated first by the Western Region of British Railways and later by the London Midland Region. In a later reorganisation, passenger services were operated by the Regional Railways Central sector. Following privatisation in the mid 1990s, passenger services were first operated by Central Trains, then by Wales & Borders from 2001 and, since late 2003, by Arriva Trains Wales.

    Closed stations

    Although the line survived the Beeching Axe, many stations were closed from the 1960s onwards. The stations closed include the following:

    Shrewsbury to Dovey Junction:

  • Hanwood
  • Yockleton
  • Westbury (Salop)
  • Plas-y-court Halt
  • Breidden
  • Buttington (connection with the Cambrian Railways line to Oswestry)
  • Forden
  • Montgomery
  • Abermule
  • Scafell Halt
  • Moat Lane Junction (connection with Mid Wales Railway to Cardiff)
  • Pontdolgoch
  • Carno
  • Talerddig
  • Llanbrynmair
  • Commins Coch Halt
  • Cemmes Road (connection with the branch line to Dinas Mawddwy)
  • Dovey Junction to Aberystwyth:

  • Glandyfi
  • Ynyslas
  • Llandre
  • Bow Street
  • Dovey Junction to Pwllheli:

  • Gogarth
  • Abertafol
  • Llangelynin
  • Black Rock Halt
  • Afon Wen (connection with the Afon Wen–Caernarfon line)
  • The Ruabon bound platforms at Barmouth Junction were also closed in 1965 and the station renamed Morfa Mawddach.
  • Politics

    The Cambrian line was not directly threatened with closure in the 1963 Beeching Report. Later threats to the coastal part of the route, from Dovey Junction to Pwllheli, were subsequently withdrawn – despite the disproportionately high cost of maintaining it. It is recognised as having an important public service role: it connects communities around coastal estuaries which have poor road links. Its tourism role is as a widely recognised scenic route, as well as linking many coastal resorts, and connecting to seven narrow-gauge tourist lines. The coastal areas served are predominantly Welsh-speaking.

    The line is sometimes confused with the Heart of Wales Line, which acquired the name "the line of the seven marginals" because it ran in the 1960s through seven Labour marginal constituencies, when a civil servant brought attention of his minister Richard Crossman, Minister of Housing and Local Government, to this fact. As a result, because of the political consequences thought to be attendant on railway closures, though scheduled for such treatment the Heart of Wales line also survived.

    Performance

    With long sections of single line and limited passing points, minor disruptions on the Cambrian Line quickly lead to compound delays and partial cancellations. This, combined with short turnaround times at each end of the route, led to severe unpunctuality during much of the first decade of the 21st century. The extension of the service to Birmingham International in late 2008 has helped address this by eliminating the tight turnarounds at the heavily-congested Birmingham New Street station. Maintenance changes and additional padding in public timetables has also helped improve performance figures overall.

    In Arriva Trains Wales' performance statistics the Cambrian Line was routinely the worst-performing service group between 2003 and 2008. Since early 2009, recorded timekeeping has improved – a considerable achievement, considering that the route has been the testing ground for brand new signalling technology previously unused on the British railway network.

    Line upgrade

    In October 2006, it was announced that Network Rail would pilot the European Rail Traffic Management System on the Cambrian Line. The ERTMS will allow headways between trains using the same track to be reduced without affecting safety, allowing a more frequent service. Should the pilot scheme be successful, the system is expected to be rolled out on other key rural routes within the UK.

    The upgrade was expected to cost £59 million and was to be completed by December 2008, but the system was only released, for limited testing between Pwllheli and Harlech, in February 2010. Three signallers from the Machynlleth signalling centre and seven drivers were trained to operate the new equipment. Ansaldo STS were the principal contractors for the upgrade, with Thales as sub-contractors for the Telecomms and Eldin as installation subcontractors for all elements of UK infrastructure. Systra is in charge of testing and commissioning the ETCS and interlocking components of the new signalling system.

    Ansaldo is installing ERTMS In Cab ETCS (European Train Control System) level 2, class 1, specification V2.3.0. As the name suggests, the driver receives the instructions for movement on the cab display. This level does not require conventional fixed signals – all the existing signals and RETB boards will be removed. Additionally, the line side speed signs will be redundant – drivers are given the appropriate maximum speed on the cab display (in km/h).

    The Cambrian ERTMS – Pwllheli to Harlech rehearsal started on 13 February 2010 and completed successfully on 18 February 2010. The driver familiarisation and practical handling stage of the rehearsal provided an excellent opportunity to monitor the use of GSM-R voice in operation on this route. The first train departed Pwllheli at 08:53 in ERTMS Level 2 Operation with GSM-R voice being used as the only means of communication between the driver and the signaller.

    Network Rail spokeswoman Mavis Choong was unable to give a figure for how much the scheme has cost, but said £400m was being spent installing it across the UK network. She claimed the 14-month delay was caused by the system "being new".

    In 2007, a new flat crossing, named "Cae Pawb Crossing", was installed at the intersection of the Cambrian Line and the Welsh Highland Railway.

    In October 2010, following completion of testing, the ERTMS system finally entered service between Pwllheli and Harlech and the previous Radio Electronic Token Block system was removed. On 18 March 2011, the final commissioning phase for the ERTMS system across the whole Cambrian route started, including layout alterations at Welshpool and Talerddig which would facilitate a desired increase in service frequency. At 07:20 on 26 March 2011, the New ERTMS signalling system was placed into operational use across the Cambrian Line controlled from Machynlleth, some 40 minutes ahead of the planned schedule. Two days of driver familiarisation then followed; passenger operation started on 28 March 2011. An initial assessment by the operating company was not favourable: problems with the design and installation of the in-cab displays were identified and infrastructure failures included the control system becoming "confused" by common train movements, such as changes of speed or shunting into the depot.

    Llanbadarn level-crossing incident

    Shortly before 22:00 on Sunday 19 June 2011, a passenger train from Aberystwyth to Machynlleth ran onto the level crossing at Llanbadarn while the barriers at the crossing were raised, and came to a stop with the front of the train about 31 metres beyond the crossing. There were no road vehicles or pedestrians on the crossing at the time. The immediate cause of the incident was that the train driver did not notice that the indicator close to the crossing was flashing red until it was too late for him to stop the train before it reached the crossing. Factors behind this included the driver's "workload" (his need to observe a screen in the cab at the same time as he should also be observing a lineside indicator), the design of the equipment associated with the operation of the level crossing, and the re-setting of the signalling system on board the train before it could depart from Aberystwyth. An underlying cause of the incident was that the signalling system now in use on the lines from Shrewsbury to Aberystwyth and Pwllheli did not interface with the automatic level crossings on these routes.

    The RAIB has made six recommendations, three directed to Network Rail, two to Arriva Trains Wales and one to the Rail Safety and Standards Board. These cover the development of engineering solutions to mitigate the risk of trains passing over automatic crossings which have not operated correctly; changes to the operating equipment of Llanbadarn crossing; the processes used by railway operators to request permission to deviate from published standards; the operational requirements of drivers as trains depart from Aberystwyth; and the way in which drivers interact with the information screens of the cab signalling used on the Cambrian lines. The failure at ERMTS System-User Interface investigated by the RAIB indicates that the ERTMS Implementation did not satisfy the non-functional attribute of safety integrity of the real time dependable distributed computing concepts.

    Services

    As of 2016, the Aberystwyth line has a near-hourly service and twelve direct trains between Aberystwyth and Shrewsbury daily, with several extended to or from Birmingham International. Trains to Pwllheli typically operate once every two hours, either as separate connecting services running to/from Machynlleth, or as portions attached to Aberystwyth services with trains dividing or joining at Machynlleth as necessary.

    Trains now run more frequently than before: resignalling of the railway and other infrastructure changes have allowed more trains to run to and from Aberystwyth since 2015. Connections are better too, as some trains run through from Birmingham New Street to Birmingham International and some also stop at Smethwick Galton Bridge from December 2009. From the 1990s until 2015, a service had typically been provided between Birmingham and Aberystwyth every two hours, with a reduced service on Sundays.

    The last scheduled freight over the line was in 1993. In 2003, freight multiple unit trials were undertaken for five weeks, transporting timber from Aberystwyth, via Wrexham General railway station to the Kronospan woodchip factory in Chirk. The trial used a pair of British Rail MPV units sandwiched around a rake of seven open-sided timber wagons.

    Coast Line infrastructure problems

    Major structural problems with Barmouth Bridge resulted in the withdrawal of services between 1980 and 1986 and the line was threatened with closure before ultimately being repaired and reopened.

    Work began in March 2013 to replace the wooden Pont Briwet viaduct over the Afon Dwyryd near Llandecwyn. The new bridge now carries two lanes of road traffic and the single track railway, and opened in 2015. It was hoped that, apart from a four-week period where power cables had to be moved, the old viaduct could remain open throughout the works. However, the bridge was found to have been affected by the piling work for the new bridge, and was declared structurally unsafe and closed in December 2013. This necessitated a diversion via Maentwrog for road users and caused rail services to terminate at Harlech. A new temporary bridge was due to open in Spring 2014, but this plan had been scrapped in favour of running a convoy system on the A496 road that serves as the diversionary route. Work then focused on completing the main railway and road bridge by the end of the year.

    In January 2014, the Coast line from Dovey Junction was closed to all trains after two sections of track between Tywyn and Barmouth were severely damaged by storm-force winds and tidal surges at the beginning of the month. Part of the sea wall protecting the trackbed at Llanaber near Barmouth was washed away, resulting in some 300 tons of ballast being lost and the formation covered in debris, whilst further south a section of embankment at Tonfanau was washed out. Two of Arriva Trains Wales's Class 158 trains were trapped at Barmouth, and were removed by road. Network Rail described the damage suffered by the line as "devastating", but stated the line to Barmouth could be (and was) reopened by 10 February 2014. Repairs north of Barmouth have been completed, and the line reopened to Harlech on 1 May 2014, two weeks ahead of schedule.

    The full line reopened on 1 September 2014.

    References

    Cambrian Line Wikipedia