Native name
  
الخط الثاني

System
  
Cairo Metro

Opened
  
1996

Stations
  
20

Type
  
Rapid transit

Status
  
Operational

Locale
  
Cairo

Cairo Metro Line 2 httpsuploadwikimediaorgwikipediacommonsthu

Daily ridership
  
895 thousand (FY 2009/2010)

Owner
  
The National Authority For Tunnels

Terminis
  
El Mounib, Shubra El Kheima

Cairo Metro Line 2 is the second line of the Cairo Metro in Cairo, Egypt.

Contents

History

Cairo's metro network was greatly expanded in the mid-1990s with the building of Line 2 (red), from Shoubra-El-Kheima to Cairo University, with an extension to Giza.

It is the first line in history to have a tunnel going under the Nile. The tunnel under the Nile is 8.35m in internal diameter and was constructed using two Herenknecht bentonite slurry shield TBMs, which are 9.43m in diameter. Extending 21.5 kilometres (13 mi) with 20 stations, it is sometimes called the "Japanese-Built Line". It is mostly in bored tunnel, with two exceptions: a short section at the northern end approaching Shubra El-Kheima which is elevated, and a section just south of this by cut-and-cover. The main difference between Lines 1 and 2 is that Line 1 uses an overhead line while Line 2 uses the third-rail system. The construction of the line was finished in October 2000 and was later extended to El Mounib. The communication for line 2 was provided by Alcatel in 2005.

Total project cost was 761 million euros.

After the 2011 Egyptian revolution, the station "Mubarak" has been renamed and is now called "Al-Shohadaa" (Arabic for "martyrs").

  • October 1996 Shobra - Mubarak (now:"Al-Shohadaa"), 8 kilometres (5 mi)
  • Sept 1998: Mubarak (now:"Al-Shohadaa") - Sadat, 3 kilometres (2 mi)
  • April 19, 1999: Sadat - Cairo University, 5.5 kilometres (3 mi) (including crossing of the Nile)
  • October 8, 2000: Cairo University - Giza Suburban 2.7 kilometres (2 mi)
  • January 17, 2005: Omm el Misryeen - Monib 2.5 kilometres (2 mi)
  • To other Metro lines

    Line 2 connects to Line 1 at Shohadaa and Sadat Stations, and with Line 3 at Attaba Station.

    To other forms of transit

    Shohadaa Station is immediately next to Ramses Station, providing access to Egyptian National Railways long-haul and short-haul domestic passenger service. Tram stops are also frequently located near Line 2 stations, as are Cairo Transport Authority buses and private microbus services.

    Access to Cairo International Airport is expected via transfer to Line 3 upon completion of Phase 5 in October 2019.

    References