The CBD Relief Line was a proposed underground railway line through the Sydney central business district. The line was intended to augment the existing city underground network and ease congestion at some of the city's busiest stations. The new line was proposed to link to the Main Suburban railway line, which would have increased that line's capacity.

Contents

The line included proposed stations at:

  • Redfern (new platforms)
  • Railway Square
  • City West
  • Wynyard (new platforms)
  • Earlier proposals

    In 2005 the NSW Labor Government announced the Metropolitan Rail Expansion Program which consisted of three new lines - the North West Rail Link, South West Rail Link and CBD Rail Link. These three new lines were intended to expand the capacity of the CityRail network and extend it to serve new areas. In 2008 the CBD Rail Link and North West Rail Link were cancelled and replaced by the North West Metro. This was to be an entirely new system with no link to the CityRail network. In 2009 the North West Metro was modified and truncated to form the CBD Metro. In 2010 the CBD Metro was cancelled and replaced by the CBD Relief Line.

    Concept

    Like the original CBD Rail Link proposal, the CBD Relief Line was intended to be integrated into the CityRail network. The CBD Relief Line was proposed to utilise the MetroWest corridor, terminate at Wynyard and link into the Western line. This differed from the CBD Rail Link which utilised the MetroPitt corridor and crossed the harbour to link into the North Shore and Epping to Chatswood lines to the north and either the Airport or Campbelltown Express lines to the south.

    The CBD Relief Line would have connected to the existing network via the "Main" pair of tracks of the Main Suburban line at the Illawarra Junction. The "Mains" can currently only be accessed by suburban trains by means of a flat junction from the "Suburban" pair of tracks, creating a bottleneck and meaning the "Mains" are not used to their full capacity. By removing the need to cross the flat junction, more suburban trains would have been able to use the "Mains" which would have freed up additional capacity on the "Suburbans" and on the existing CBD lines.

    The proposed operational arrangement was dubbed "Western Express". This concept envisaged limited stops trains commencing from Wynyard, then utilising the CBD Relief Line, the "Main" pair of tracks on the Main Suburban line and the Western and Richmond branch lines to provide faster & more frequent travel between the Sydney CBD, the Parramatta CBD and the outer Western Suburbs. The Government claimed this would enable a 5-minute reduction in travel time and a 90% capacity improvement between Wynyard and Parramatta, and a 10-minute reduction in travel time and a 50% capacity improvement between Wynyard and Penrith or the Richmond branch line.

    Cancellation

    In early 2011, the then state opposition indicated it would defer the project, preferring to instead focus on the North West Rail Link. After winning the March 2011 state election the Barry O'Farrell Government cancelled the project.